Laserfiche WebLink
<br /> CERTifiCATE Of Distribution to: <br /> OWNER KJ <br /> SUBST ANTIAl ARCHITECT 0 <br /> COMPLETION CONTRACTOR KJ <br /> FIELD 0 <br /> AlA DOCUMENT G704 OTHER 0 <br /> PROJECT: Improvements to the Police & ARCHITECT: Jeffrey H. Kester <br /> (name, address) Courts Bldg <br /> 401 E Hopkins ARCHITECT'S PROJECT NUMBER: 84-044 <br /> San ¡'1arcos, TX 78666 <br /> TO (Owner): CONTRACTOR: K-W Construction <br /> I City of San Marcos I CONTRACT FOR: Interi or improvements <br /> 630 E Hopkins <br /> San Marcos, TX 78666 <br /> L .J CONTRACT DATE: May 14, 1984 <br /> DATE OF ISSUANCE: October 16, 1984 <br /> PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Renovation and improvements as described <br /> in plans and specifications <br /> The Work performed under this Contract has been reviewed and found to be substantially complete, The Date of Substantial <br /> Completion of the Project or portion thereof designated above is hereby established as October 16, 1984 <br /> which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. <br /> DEfiNITION OF DATE OF SUBSTANTIAL COMPLETION <br /> The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when <br /> construction is sufficiently complete, In accordance with the Contract Documents, so the Owner can occupy or utilize the <br /> Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. <br /> A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect, is <br /> attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all <br /> Work' in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list will <br /> be the date of final payment unless otherwise agreed to in writing. ( <br /> ~~^: /0.(6'Sf <br /> ARCHITECT " B' , DATE <br /> Jeffrey H. Kester Architect effrey . Kester <br /> The Contractor will complete or correct the Work on the list of items attached hereto within days <br /> from the above Date of Substantial Completion. ~ ~ <br /> ~ to -l +- <br /> CONTRACTOR DATE <br /> K-W Construction Ji Kelley <br /> The Owner accepts the Work or designated portion thereof e and will assume full possession thereof <br /> ,t %~ (Q (time) O" (date). <br /> I~/.{~ fý <br /> ert' ~ DATE I <br /> 1 of San Marcos The responsibilities of the Owner and the Contractor for secu ty, maintenance, heat, utilities, damage to the Work <br /> and insurance shall be as follows: <br /> (Note-Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage; Contractor <br /> shall secure consent oi surety company, ii any.) <br /> AlA DOCUMENT G704 . CERTIFICATE OF SUBSTANTIAL COMPLETION . APRIL 1978 EDITION . AIA@ <br /> @ 1978' THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.c. 20006 G704 -1978 <br />