Laserfiche WebLink
Handbook for Planning Data Services <br />TABLE OF CONTENTS <br />1. Purpose <br />2. Handbook Updates <br />3. ERGOT Annual Load Data Request (ALDR) <br />4. ERGOT Automatic Under - frequency Load Shedding (UFLS) <br />5. ERGOT Power Flow Cases <br />6. ERGOT Short Circuit Cases <br />7. ERGOT Dynamics Database <br />8. ERGOT Transmission Project Information Tracking (TPIT) <br />9. Special Protection Systems (SPS) <br />References <br />1. LCRA TSC Operations Handbook <br />2. ERGOT Planning Guide <br />3. ERGOT Nodal Operating Guides <br />4. ERGOT SSWG Procedure Manual <br />5. ERCOT SPWG Procedures <br />6. LCRA UFLS Procedure (Planning) <br />7. NERC Reliability Standards <br />2 1 Rag„ Rev, 0 <br />