Laserfiche WebLink
Handbook for Planning Data Services <br />4. ERCOT Automatic Under - frequency Load Shedding (UFLS) <br />Description: <br />Section 2.6 of the ERCOT Nodal Operating Guides provides UFLS requirements for <br />ERCOT Transmission Operators and TDSPs. To meet the requirements of Section 2.6, <br />LCRA and Owners will perform the following requirements, according to the appropriate <br />ownership scenario: <br />Owner Shall: <br />1. Comply with Section 5.0 of the LCRA TSC Operations Handbook. <br />2. Comply with the LCRA TSC UFLS Procedure (Planning), attached. <br />LCRA Shall: <br />1. Comply with Section 5.0 of the LCRA TSC Operations Handbook. <br />2. Comply with the LCRA TSC UFLS Procedure (Planning) attached. <br />3. Send ERCOT/TRE acknowledgement of receipt of data to Owner. <br />Reference: <br />• ERCOT Nodal Operating Guide Section 2.6. <br />• LCRA TSC UFLS Procedure (Planning) <br />6lPaR, Rev. 0 <br />