Laserfiche WebLink
Attachment A. Scone of Service-. and Man -Hnnr RrPakrinwn <br />13 <br />x {: <br />LABOR COST DETAIL <br />m m <br />C <br />U) <br />m <br />W <br />N <br />« <br />W <br />N <br />O <br />y 0 <br />0 7 <br />N LN <br />y C <br />C 'a) d <br />U <br />1mf A <br />U . <br />nC <br />I W <br />y <br />Y <br />N <br />L (a 0 <br />A <br />Task Description <br />CO m <br />c N <br />dw min <br />o u 0 <br />UW71tn <br />06 <br />c <br />tu/n <br />n 44 <br />-o 6 <br />C <br />W % IWO <br />Z 4) 0 <br />a <br />Cr4U (90 <br />a <br />of <br />Rate <br />$ 205 $ 190 <br />$ 140 <br />$ 100 <br />$ 95 <br />$ 701$ 60 <br />Review record data, existing outfall construction plans, storm drain <br />1 <br />plans, perform site investigations, project start-up, field meetings with <br />4 <br />24 <br />$4,120 <br />28 <br />sub - contractors <br />2 <br />Perform field survey <br />2 <br />8 <br />$5,200 <br />$6,700 <br />10 <br />3 <br />Perform geotechnical borings and prepare soils report <br />4 <br />8 <br />$5,710 <br />$7,5901 <br />12 <br />Perform biological and ordinary high water assessment, note findings in <br />4 <br />a technical memo that will assess perform <br />2 <br />8 <br />16 <br />$3,020 <br />26 <br />Assess design options, prepare schematic designs and cost estimates for <br />5 <br />three options regarding storm drain system and outfall structure <br />4 12 <br />32 <br />8 <br />8 <br />$3,480 <br />$12,380 <br />64 <br />Meet with City staff, review schematic designs and obtain direction on <br />6 <br />selected option <br />2 <br />4 <br />$940 <br />6 <br />7 <br />Develop conceptual /50%design plans for City review and comment <br />2 12 <br />36 <br />12 <br />32 <br />$11,110 <br />94 <br />8 <br />Meet with City staff, obtain comments and input <br />2 <br />4 <br />$940 <br />6 <br />9 <br />Prepare final construction plans and specifications <br />2 8 <br />24 <br />8 <br />16 4 <br />$7,410 <br />62 <br />Obtain necessary permits, assume that a Corps 404 permit will not be <br />10 <br />necessary, includes TCEQTPDES and City of San Marcos, <br />4 <br />8 <br />4 <br />$2,260 <br />16 <br />11 <br />Prepare construction quantities and specifications, attend bid meetings <br />and respond to questions <br />0 4 <br />12 <br />24 <br />0 4 <br />$4,960 <br />44 <br />12 <br />Construction phase services (review RFI's and submittals, respond to <br />contractor questions, perform site visits) <br />0 12 <br />32 <br />8 <br />0 0 <br />$7,520 <br />52 <br />Task Hours <br />8 <br />68 <br />200 <br />0 <br />80 <br />56 <br />8 <br />Task Cost <br />$1,540 <br />$12,920 <br />$28,000 <br />$0 <br />$7,600 <br />$3,920 <br />$480 <br />$ 54,560 <br />Mileage and Reproduction Costs <br />$800 <br />Subconsultant Costs <br />$5,710 <br />$5,200 $3,480 <br />14,390 <br />Task Cost <br />$1,640 $12,920 <br />$28,000 <br />$0 <br />$7,600 <br />$3,920 $480 <br />$0 <br />$ 69,750 <br />13 <br />