Laserfiche WebLink
Attachment B, Project Schedule <br />Blanco River —River Road Slope Stabilization Project <br />Key Milestones <br />Begin project <br />Prepare 50% design plans <br />Permit assessment <br />Prepare 95% design plans <br />100% Design Plans and specifications <br />Advertise and bid project <br />Construction <br />14 <br />Completion Date <br />May 2014 <br />August 15, 2014 <br />September 2014 <br />October 15, 2014 <br />November 15, 2014 <br />To be determined by the City <br />To be determined by the City <br />