My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-163
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 2:50:45 PM
Creation date
9/19/2007 9:35:40 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-163
Date
9/18/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> <br />This Agreement is made this the 19th day of September <br />of San Marcos, Texas ("City"), 630 East Hopkms, San Marcos, <br />Engmeering Consultants, Inc. (the "Engmeer"), 11550 IH 1 0 West, <br />Texas 78230-1037 for the provisIOn of servIces in connection <br />Replacement Project (the "Project"). <br /> <br />, 2007, between the City <br />Texas 78666 and Civil <br />Suite 395, San Antomo, <br />WIth Quail Run Water <br /> <br />The City and the Engmeer agree as follows: <br /> <br />ARTICLE 1 <br />ENGINEER'S SERVICES AND RESPONSIBILITIES <br /> <br />1.1 STANDARDS OF PERFORMANCE <br /> <br />1.1.1 Engmeer will be responsible for the proper, accurate and adequate design and <br />preparation of plans and specifications and other construction contract documents and for <br />construction admmistration for the Project. The Project generally includes the replacement of an <br />eXIsting four mch waterhne along Quail Run with an eight inch waterline. The project will <br />Improve the CIty's water service to the Sleepy Hollow area and he the recently acquired <br />Diamond Pure water system into the City's system. <br /> <br />1.1.2 The Engineer's Basic Services consist of the servIces described in Sections 1.1 through <br />1.4 and include normal civil engineering services and surveying services as well as those <br />engineering services to be perfonned through the following consulting disciplines as <br />subcontractors to the Engineer. <br /> <br />1.1.3 The perfonnance of all services by the Engineer in connection with this Agreement will <br />be by persons appropriately licensed or registered under State, local and Federal laws governing <br />their respective consultmg disciphnes. In perfonning all services under this Agreement, the <br />Engineer will use that degree of care and skill ordinarily exercised for similar projects by <br />professional Engineers who possess special expertise in the types of services involved under this <br />Agreement. <br /> <br />1.1.4 No work under this Agreement will be subcontracted by the Engineer without prior <br />written approval from the City. Any work or servIces subcontracted under this Agreement shall <br />be specified by separate written Agreement and shall be subject to each provision of this <br />Agreement. <br /> <br />1.1. 5 Any provisions m this Agreement pertammg to the City's review, approval and/or <br />acceptance of written materials prepared by the Engineer and/or its subconsultants, contractors, <br />and subcontractors m connectIOn with this Agreement will not diminish the Engineer's <br />responsibility for the matenals. <br /> <br />CEC - Quail Run Waterline Agreement <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.