<br />1.1.6 Engmeer will perfonn all of its services in coordmation wIth the CIty. The Engineer will I <br />advise the CIty of data and infonnatlOn the Engineer needs to perform its servIces and the <br />Engineer will meet with CIty representatives at mutually convenient tunes to assemble this data <br />and mfonnatlOn. <br /> <br />1.2 TASK 1 - PRELIMINARY DESIGN <br /> <br />The Engineer will: <br /> <br />1.2.1 Assemble a Project team comprised of the City's representatives and the Engineer's <br />representatives. The Engmeer will meet with the ProJect team to set the design and production <br />schedule and parameters for all subsequent work, to venfy the components wIthin which all <br />ProJect particIpants must perform, and to identify all parties and significant deadlines involved in <br />the comprehensive schedule strategy. Based on this mfonnation, the Engmeer wIll prepare a <br />detailed schedule of Its work for the Project addressing each component of the work to be done, <br />indicating the points of involvement of all project partIcIpants. The Engineer will conduct <br />progress meetmgs between the Project team and the Contractor once the construction contract is <br />executed. <br /> <br />1.2.2 Assist the CIty m connectIOn wIth the City's responsibIlIty for fihng documents required <br />for the approval of governmental authonties having junsdlction over the Project. <br /> <br />1.2.3 Identify pennits that are required from appropriate regulatory agencies in order to <br />construct the ProJect. The Engmeer wIll contact those regulatory agencies that may have <br />penmtting junsdiction including the Edwards Aquifer Authority ("EAA"), Hays County, and the <br />Texas Commission on Environmental QualIty ("TCEQ"). In addItIOn, the Engineer will confinn <br />with Hays County whether it IS required that Quail Run be bored across or whether the <br />reqUIrement will be to open cut Quail Run WIth the new waterline. NeIther party to this <br />Agreement anticipates that the EAA will require special pennitting, however, the Engineer will <br />notify the City of any special penmtting reqUIrements that apply to thIS Project. The Engineer <br />WIll also notify TCEQ of the Project in accordance WIth T AC, Chapter 290 to detennine whether <br />or not a revIew of the construction documents is required. <br /> <br />1.2.4 Coordinate with the City's consultant to verify whether the proposed water lme should be <br />an eight inch line or larger sIze lme. The City will enter mto a separate contract with a <br />consultant to complete this analysis. The City's consultant will also revIew the booster pumping <br />capacity at the Oak Ridge pump statIOn. In the event that booster pump improvements are <br />reqUIred, the Engineer will complete a visual survey of the existing system and prepare a scope <br />of services for additIOnal services to cover design. <br /> <br />1.2.5 Prepare an alignment study that will examine the proposed Project alignment and will <br />identIfy Issues that Impact the constructability of the Project. The primary issues of concern <br />mclude existing power line locations and locatIOn of any significant trees (to be deCIded by the <br /> <br />CEC - Quail Run Waterlme Agreement <br /> <br />2 <br /> <br />I <br /> <br />I <br />