Laserfiche WebLink
<br /> TABLE 7 A. CONSTRUCTION COST ALLOCA TIONS* <br /> H A" = Riyergate MUDs if: Does Not Include <br /> -8- = Highridge MUDs Contingencies or <br /> HC" = City of San Marcos Engineering <br /> 1990 Improvements <br /> I ntercep tors <br /> Interceptor (West of IH 35). 1.000 ft. <br /> A= X '" <br /> ::::: t ::::: <br /> 18" Interceptor (East of IH 35). 5.000 ft. <br /> B=1 X ::::: <br /> 27'" Combined Interceptor. 4,500 ft. <br /> A= 1 1 X ::::: $266,588 <br /> B ::::: 3 t t 1 <br /> c= 11 : <br /> 30'" Combined Interceptor, 4,500 ft. <br /> A: i i X ::::: <br /> B ::::: 31 1 1 X <br /> c= 1 1 X : <br /> l j ft Stat j ons <br /> At Wastewater Treatment P1ant, 1,400 gpm <br /> A= 1 X $196,000 ::::: t <br /> B::::: 1 $1 <br /> C= 1 $1 '" <br /> West of IH 35. 1.000 gpm <br /> A=l X $1 ::::: $ t <br /> Wastewater Treatment Plant, 600,000 gpd <br /> = 1 $1 = <br /> B= 1 X $1 :::::; <br /> :::::; 1 $1 :::::; <br />