Laserfiche WebLink
<br /> TABLE 7B. CONSTRUCTION COST ALLOCATIONS <br /> 1995 Improvements <br /> lift Stations <br /> Sink Creek~ 460 gpm <br /> C=1 X = <br /> West of I H 2~OOO gpm <br /> = X = <br /> X ::: <br /> South of Wastewater Treatment Plant, 800 gpm) <br /> C=1 X $11 = $11 <br /> At Wastewater Treatment Plant, 2,000 gpm <br /> A::: 21 X = $1 199 <br /> B::: 1 X ::: $92,030 <br /> C= X ::: 1 <br /> Force Mains <br /> 8" Main (West of IH 35 in Sink CkJ, 4,500 ft. <br /> C=1 X $121 = $121,500 <br /> 10" Main (South of Wastewater Treatment Plant), 8,200 ft. <br /> C=1 X = <br /> Wastewater Treatment Plant" 1.2 mgd <br /> A = 21 X <br /> 8=1 X = <br /> C= X '" <br />