Laserfiche WebLink
<br /> TABLE 7C. CONSTRUCTION COST ALLOCATIONS <br /> 2005 Improvements <br /> lift stations <br /> S1nk Creek» 460 gpm <br /> = 1 X :::::: <br /> South of Wastewater Treatment Plant. 800 gpm <br /> C=l X :::: <br /> At Wastewater Treatment Plant, 4,000 gpm <br /> A= X $440,000 :::: $1 <br /> B:::::: X $440,000 :::::: <br /> C:::::: X = <br /> West of IH 35, 2,150 gpm <br /> A:::::: X :::: <br /> X $330,000 :::::: <br /> Wastewater Treatment Plant. 2.4 mgd <br /> A:::::: X :::: <br /> B= X :::: <br /> C= X = <br />