Laserfiche WebLink
<br /> Table 8. Summary of Construction Costs <br /> Rivergate Highridge City T ota) Cost <br /> MUDs MUDs <br /> 1990 t t <br /> 1995 1 <br /> 2005 19 12 <br /> Subtotal I <br /> 15" Contingencies 896,993 41 <br /> 1 0" Engj neerj ng 31 1 460,812 1 <br /> Total 7,564,643 3,480,631 5,068,927 16,114,20 t <br />