Laserfiche WebLink
A. RESIDENTIAL SERVICE <br />The City will construct a standard overhead primary line extension (single -phase) to <br />provide service to a residential, multi - family, or commercial facility requiring full time <br />service at the regular established rates and minimum monthly charges under the <br />following conditions: <br />SMEU shall estimate the cost for the line extension based on current unit material and <br />labor costs for the required service. The estimated cost is the total cost of all <br />construction including not only labor and materials used in constructing the extension, <br />but also engineering, right -of -way and clearing, overhead, and all other costs attributable <br />to the extension. <br />CONTRIBUTION -IN- AID -of- CONSTRUCTION FEES <br />The contribution -in- aid -of- construction (CAIC) is a fee paid by the customer to help <br />cover the costs of extending lines. The CAIC is non - refundable and must be paid before <br />construction begins. <br />PERMANENT RESIDENCE- Customer pays a non - refundable Contribution - <br />In- Aid -of- Construction (CAIC) for all estimated line extension costs greater than <br />$1500.00. The estimated cost is the total of all construction including labor, <br />materials, engineering, right -of -way acquisition and clearing, and any other costs <br />directly attributable to the extension. <br />2. MULTIPLE DWELLING- A standard overhead line extension will be <br />extended for service to multiple dwellings on the same basis as for a Permanent <br />Residence, with consideration being given for the number of dwelling units and <br />the expected occupancy ratio. <br />MOBILE HOME- Electric service will be provided to a customer owned meter <br />pole from the City's existing primary lines. In situations where the extension of <br />primary facilities is required to serve a mobile home, the applicant will be <br />required to pay the estimated cost in advance for constructing the extension. <br />Customer pays a non - refundable Contribution -In- Aid -of- Construction (CAIC) <br />for all estimated line extension costs greater than $1500.00. The estimated cost <br />is the total of all construction including labor, materials, engineering, right -of- <br />way acquisition and clearing, and any other costs directly attributable to the <br />extension. <br />MOBILE HOME PARKS AND MOBILE HOME SUBDIVISIONS- Mobile <br />homes to be located inside City- designated Mobile Home Parks and Mobile <br />Home subdivisions will be provided service in accordance with Appendix A, <br />Section G. <br />6. SEASONAL FACILITIES- A permanent electric service will be provided <br />from the City's existing primary lines. Where extension of primary facilities is <br />required to serve weekend or resort homes, cabins and other domestic facilities <br />which are not utilized on a full time basis, the applicant will be required to bear <br />the actual cost for constructing the entire extension. <br />