Laserfiche WebLink
B. COMMERCIAL SERVICE <br />The city will construct an overhead primary line extension to provide permanent service <br />to a commercial facility requiring full time service at the regular established rates and <br />minimum monthly charges under the following conditions: <br />SMEU shall estimate the cost for the line extension based on current unit material and <br />labor costs for the required service. The estimated cost is the total cost of all <br />construction including not only labor and materials used in constructing the extension, <br />but also engineering, right -of -way and clearing, overhead, and all other costs attributable <br />to the extension. <br />Customer pays a non - refundable Contribution -In- Aid -of- Construction (CAIC) for all <br />estimated line extension costs greater than $1500.00. The estimated cost is the total of <br />all construction including labor, materials, engineering, right -of -way acquisition and <br />clearing, and any other costs directly attributable to the extension. <br />1. GENERAL SERVICE AND SMALL COMMERCIAL <br />a. Electric service will be provided to water wells, barns, signs and other <br />non - residential locations from the city's existing primary lines. In <br />situations where the extension of primary facilities is required, the <br />applicant will he required to pay the estimated cost in advance for <br />constructing the extension. <br />2. LARGE COMMERCIAL <br />Customer pays a non - refundable Contribution -In- Aid -of- Construction (CAIC) <br />for all estimated line extension costs greater than $1500.00. The estimated cost <br />is the total of all construction including labor, materials, engineering, right -of- <br />way acquisition and clearing, and any other costs directly attributable to the <br />extension. <br />Where it can be demonstrated that the expected annual revenues (derived from base <br />rates, exclusive of fuel) to be paid by the prospective commercial customer will generate <br />the required margins to cover the total cost of constructing the extension, disregarding <br />any allowance; the City may, at its option, extend service without an excess construction <br />cost payment by the customer. <br />C. INDUSTRIAL SERVICE <br />The city will, through negotiations with a prospective Industrial customer, provide the <br />necessary facilities to extend electric service to a new Industrial site under the provisions <br />and terms of a developed Electric Service Agreement. The general principles reflected in <br />extending service to commercial customers shall be incorporated into such an agreement. <br />Based upon an economic evaluation of a prospective industrial facility, the city reserves <br />the right to require payment or deposit of funds in advance to defray certain costs <br />associated with providing service to the facility. <br />