<br />1.7.21 Review and make all decIsions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, IncludIng but not lImited to, shop drawIngs, product data <br />and samples, schedule of values and progress schedule and verify that submIttals are consistent <br />with the requirements of the construction contract. Such action will be taken with reasonable <br />promptness, but generally not to exceed 30 days or such period of time as will not cause delay of <br />the Project. The Engineer wIll advise the Contractor of any areas where the schedule is not In <br />compliance with the construction contract and will provide comments to the City to assist the <br />City in approving, accepting or takIng other action on the contractor's schedule, in accordance <br />wIth the construction contract. In additIon, the Engineer will review the Contractor's periodIc <br />schedule updates or other schedule submIssions and wIll advIse the Contractor if the updates or <br />other submIssions are not in accordance with the construction contract. The Engineer will <br />provide comments to the City regarding the updates or other submissions as provided by the <br />Contractor. The EngIneer's reVIew and comments will not be considered as a guarantee or <br />confirmatIon that the Contractor will complete the work In accordance with the contract for <br />construction. <br /> <br />1.7.22 Provide wntten responses to the Contractor's request for interpretation or clarification of <br />the contract documents and will obtain from the Contractor a proposed shop drawIng and <br />submittal schedule, whIch wlll identify all shop draWIngs, samples and submittals required by the <br />contract for construction, along with the antIcipated dates for submission. The Engineer will <br />provide review of the Contractor's shop drawings, samples, and other submittals and will log and <br />track all shop drawings, samples and submittals. It IS assumed by both parties that the Contractor <br />will make less than 80 submIttals and 40 re-submittals. The Engineer's review of all shop <br />drawings, samples and submittals wIll be for general conformance with the design concept and <br />general compliance with the requIrements of the contract for construction. Such review will not <br />relieve the Contractor from its responsibIlIty for performance in accordance with the contract for <br />construction, nor is such review a guarantee that the work covered by the shop drawIngs, <br />samples and submittals is free of errors, InconSIstencies or omIssions. The Engineer's scope will <br />be based upon the scope of work in the constructIon contract and will include a maXImum of two <br />submissions by the Contractor for each shop drawIng, sample or submission. Should there be <br />addItIonal reVIews required due to no fault of the Engineer, the Engineer will be entitled to <br />addItional compensation from the City. The Contractor performing the work will ultimately be <br />responsible for the payment of compensation due the EngIneer for the performance of additional <br />reviews as set forth in the ConstructIon Contract between the City and the Contractor. <br /> <br />1.7.23 The Engineer will review the Contractor's RFI or clarification of the construction <br />contract and will coordInate such review with the City as appropriate. The Engineer will <br />coordinate and issue responses to approximately 80 RFI or clarifications as requested by the <br />contractor for the duratIon of the Project. The Engineer WIll log and track the Contractor's <br />requests. <br /> <br />1.7.24 Assist the City in reviewing and responding to the Contractor's requests for substitutIon <br />of materials and equipment and will advise the Owner as to the acceptability of such <br />substitutions. <br /> <br />1.7.25 Authorize minor variations/field instructIon and prepare minor changes in the plans and <br />Wet Weather Improvements Project - CH2M Hill <br /> <br />11 <br />