My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-196
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 2:46:33 PM
Creation date
11/21/2007 9:13:52 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2007-196
Date
11/20/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... . <br /> <br />Attachment A-1 <br /> <br />Payment Provisions and Work Responsibilities <br /> <br />The Local Government will pay for the cost of the construction to reconfigure the ramps The Local Government's <br />participation is 100% of the cost of this particular improvement. The Local Government's estimated cost of this additional <br />work is $2,429,660 including construction items, Direct Costs (excluding E&C) and Indirect costs. The State has estimated <br />the project to be as follows <br /> <br />Description Total Federal State Local <br /> Estimate Participation Participation Participation <br /> Cost <br /> % Cost % Cost % Cost <br /> CONSTRUCTION COSTS <br />Construction of Ramp $2,225,545 0% $0 0% $0 100% $2,225,545 <br />Reconfiguration <br />Construction of Frontage $634,964 90% $571 ,468 10% $63,496 0% $0 <br />Road Improvements <br />Construction Engineering $289,321 90% $260,389 10% $28,932 0% $0 <br />and Inspection (13%) <br />Subtotal $3,149,830 $831,857 $92,428 $2,225,545 <br />Direct State Costs $66,766 0% $0 0% $0 100% $66,766 <br />(including plan review and <br />environmental review) 3% <br />Indirect State Costs (no $137,349 0% $0.00 0% $0.00 100% $137,349 <br />local participation required <br />except for service <br />projects) 4 27% <br />TOTAL $3,353,945 $831,857 $92,428 $2,429,660 <br /> <br />Direct State Cost will be based on actual charges. <br /> <br />Local Government's Participation of applicable construction bid items (100%) = i 2,429,660 <br /> <br />This is an estimate only; final participation amounts will be based on actual charges to the project. <br /> <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.