My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-010/agreement between the City and Freese and Nichols, Inc. for the provision of Professional Engineering Services in connection with The Hopkins Street: Bishop to Moore Improvements Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-010/agreement between the City and Freese and Nichols, Inc. for the provision of Professional Engineering Services in connection with The Hopkins Street: Bishop to Moore Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 10:34:08 AM
Creation date
2/13/2015 12:49:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-10
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hopkins Street — Preliminary Engineering <br />Attachment A <br />January 22, 2015 <br />1��OJppFG dpi flpA� n �y 11V�µp41 �a dL , u���� <br />(c) Storm drain information for the existing system on the north end of the project <br />(Discharge Point 3) will be obtained from the City. <br />(2) Up to twenty (20) additional street cross - sections at locations designated by FNI after the <br />site visits to help identify drainage patterns, determine street flow capacity, and the <br />identify flooding outside of the right -of -way. <br />D. Level B SUE on all utilities within the project limits. <br />E. Prepare a base map suitable for use in engineering design, showing existing rights of way and <br />adjoining property lines. <br />F. Right of Way Mapping. Mapping of existing right of way will be as "apparent right -of -way" as <br />opposed to a right -of -way retracement. If a right -of -way retracement is required for parcels in <br />which right of way is not being acquired, it will be as an additional services. <br />G. Obtain written permission (Rights -of -Entry) from property owners so that the Surveyor and /or <br />their assigns are able to enter upon their property for surveying purposes. <br />3. Geotechnical investigation <br />A. Perform a total of four (4) soil borings within the area of the proposed storm sewer and roadway <br />reconstruction. The borings will be drilled to depths ranging from 10 to 15 feet each for a total <br />drilling amount not to exceed 60 feet, to include traffic control and any street cut permits. <br />B. If groundwater is encountered, the groundwater levels within the open borehole(s) will be <br />recorded at the time of drilling and immediately following drilling. Laboratory testing will be <br />performed on recovered samples selected by the geotechnical engineer to aid in soil <br />classification and to measure engineering properties. Prepare formal engineering report that <br />will include: <br />(1) Description of the field exploration program, laboratory testing program, and Soil boring <br />plan that depicts borehole locations on a base map; <br />(2) Soil boring logs with soil classifications based on the USCS (ASTM D2487); <br />(3) Generalized site stratigraphy and engineering properties developed from field and <br />laboratory data at the explored locations; <br />(4) Depth where groundwater was encountered during drilling and its impact on construction; <br />(5) Recommendations, design parameters and construction considerations for utility <br />installation; <br />(6) Pavement analysis in accordance with City and AASHTO requirements forthe specified road <br />type, and development of recommended pavement sections with consideration of the <br />feasibility of lime stabilization, material requirements, and construction considerations; <br />and <br />(7) The suitability for use of on -site materials for compacted backfill will be discussed. <br />C. The pavement section thicknesses for the proposed pavements will be developed in accordance <br />with the City or AASHTO Manual. <br />(1) City shall provide FNI traffic loading and traffic counts for use in pavement design. <br />[OFF140411 L: \OLCR \San Marcos <br />
The URL can be used to link to this page
Your browser does not support the video tag.