My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-010/agreement between the City and Freese and Nichols, Inc. for the provision of Professional Engineering Services in connection with The Hopkins Street: Bishop to Moore Improvements Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-010/agreement between the City and Freese and Nichols, Inc. for the provision of Professional Engineering Services in connection with The Hopkins Street: Bishop to Moore Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 10:34:08 AM
Creation date
2/13/2015 12:49:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-10
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hopkins Street — Preliminary Engineering <br />Attachment A <br />January 22, 2015 <br />COMPENSATION <br />FNI proposes to furnish our services as described herein in accordance with Attachment CO, <br />"Compensation ". The total fee for Basic Services shall be computed on the basis of Attachment CO but <br />shall be the not to exceed fee of FOUR HUNDRED EIGHTY FIVE THOUSAND DOLLARS ($485,000) as shown <br />in the Summary of Effort. If FNI sees the Scope of Services changing so that additional services are needed, <br />FNI will notify the City for the City's approval before proceeding. Additional services shall be computed <br />based on the Schedule of Charges found in Attachment CO. <br />Payment of the services shall be due and payable upon submission of a statement for services. Statements <br />for services shall not be submitted more frequently than monthly. <br />Summary of Effort <br />Task Fee <br />Basic Services <br />Project Management <br />$46,600 <br />Survey and SUE <br />$72,000 <br />Geotechnical Investigation <br />$10,780 <br />Drainage Study <br />$51,100 <br />Roadway Schematic Design <br />$44,600 <br />Public Involvement <br />$38,300 <br />Landscape and Streetsca a <br />$24,220 <br />City Utility Improvements <br />$23,910 <br />San Marcos Utility Improvements <br />$19,040 <br />Environmental Services <br />$8,730 <br />Preliminary Design 30% Drawings) <br />$145,720 <br />Total Basic Services <br />$485,000 <br />Additional/Special Services <br />Drainage Design <br />$47,820 <br />Traffic Study/Signal Design <br />$24,550 <br />Easements <br />$34,840 <br />Additional SUE <br />$49,320 <br />$156540 <br />[OFF14041] L: \OLCR \San Marcos <br />
The URL can be used to link to this page
Your browser does not support the video tag.