My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-010/agreement between the City and Freese and Nichols, Inc. for the provision of Professional Engineering Services in connection with The Hopkins Street: Bishop to Moore Improvements Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-010/agreement between the City and Freese and Nichols, Inc. for the provision of Professional Engineering Services in connection with The Hopkins Street: Bishop to Moore Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 10:34:08 AM
Creation date
2/13/2015 12:49:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-10
Date
2/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hopkins Street — Preliminary Engineering <br />Attachment A <br />January 22, 2015 <br />B. Drainage - Preliminary plan and profile sheets; Preliminary Cross - Sections (if needed) <br />C. Streetscape - Preliminary hardscape plans; Preliminary landscape plans and recommended plant <br />list; Preliminary design of gateway feature /monuments. <br />D. Water /Wastewater Utility Improvements -Preliminary Plan view showing utilities to be replaced <br />in and adjacent to Hopkins Street and Belvin. Preliminary Plan and Profile view showing utilities <br />to be replaced in and adjacent to Hopkins Street and Belvin. Modify drawings per City <br />comments. <br />E. Cost Estimates and Phasing - Provide updated opinions of probable construction cost and work <br />with City Staff to identify potential phasing options / opportunities. <br />ADDITIONAL SERVICES <br />The following items are outside of the basic services scope but can be provided upon written authorization <br />of the OWNER. <br />1. Environmental: NEPA Process and approval with TxDOT <br />2. Take the Conceptual Schematic to a TxDOT required level of detail for TxDOT approval <br />3. Traffic Study or Traffic Signal Design. <br />4. ROW and /or Easement metes and bounds and acquisition. <br />5. Drainage: Develop improvement alternatives for watershed drainage (see Task 4.D.3) <br />6. Perform CCTV investigation of existing utilities if required to determine necessary improvements. <br />7. Perform additional SUE services beyond those performed in the Basic Services (potholing) <br />TIME OF COMPLETION <br />FNI is authorized to commence work on the Project upon execution of this Agreement and agrees to <br />complete the services in accordance with the attached schedule: <br />If FNI's services are delayed through no fault of FNI, FNI shall be entitled to equitable adjustment of <br />compensation and FNI shall be entitled to adjust contract schedule consistent with the number of days of <br />delay. <br />[OFF140411 L: \OLCR \San Marcos <br />
The URL can be used to link to this page
Your browser does not support the video tag.