Laserfiche WebLink
Subsurface Utility Engineering (SUE). SUE Quality Level A is provided as an allowable <br />amount for locations of anticipated utility conflicts. Precise horizontal and vertical <br />location of utilities will be obtained by precise measurements of exposed structures at <br />given points. The results will be included in the plan documents. These locations include <br />a maximum of three (3) locations to be identified at the IH 35 and University Drive <br />rights -of -way and two (2) locations identified at the San Marcos Wastewater Treatment <br />Plant for the hydropneumatic tank in the vicinity of the Reclaimed Water Pump Station. <br />No SUE locations are proposed in association with either the Storage Supply Pipeline or <br />Stored Water Return Pipeline. <br />Stormwater Pollution Prevention Plan (SWPPP) - RPS will prepare a SWPPP for <br />compliance with the Texas Pollution Discharge Elimination System (TPDES) and rules <br />administered by the Texas Commission on Environmental Quality (TCEQ). The <br />document will be made available to the selected contractor; however, the contractor will <br />be responsible to maintain compliance and file the appropriate notices to the TCEQ <br />including Notice of Intent (NOl). <br />Deliverables: TxDOT Utility Crossing permit. <br />ASR Phase 1 Feasibility Technical Memorandum. <br />Reclaimed Water Pumping Evaluation Technical Memorandum <br />Draft EID transmitted for agency review (6 bound copies). <br />Final EID that incorporates review comments transmitted to TWDB (3 bound <br />copies). <br />SWPPP — 1 final copy as a PDF file. <br />Task 3 — Preliminary Engineering (30% Design) <br />RPS will prepare a PER for review by the City and for submission to TWDB. A draft PER will <br />be provided prior to a 30% design workshop to be scheduled as part of a regular project meeting. <br />The report will generally include updated projected reclaimed water demands, preliminary <br />geotechnical data report, EID, technical memoranda on disinfection, stored water filtration, a list <br />of technical specifications, opinions of probable construction costs, along with appropriate <br />exhibits. <br />• The PER will be printed on 8 %z" x 11" paper with exhibits no larger than 11" x 17 ". <br />• Comments and input from City will be incorporated into the report before submission to <br />TWDB. Additional comments from TWDB will be incorporated into the report as <br />necessary prior to submitting a final report. <br />[iii <br />