My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-051/Professional services contract for design of reclaimed water system expansion
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-051/Professional services contract for design of reclaimed water system expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 10:26:28 AM
Creation date
5/26/2015 2:43:27 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-51
Date
5/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The PER will include content of the Engineering Feasibility Report (EFR) required by TWDB <br />for CWSRF funding and will generally include the following elements: <br />• Disinfection process assessment. <br />• Evaluate the effectiveness of the existing reclaimed water disinfection system in <br />meeting the requirements of TCEQ regulations under 30 TAC Chapter 210 and <br />Chapter 217. <br />• Evaluate the effectiveness and costs of alternative disinfection systems for <br />oxidation of emerging contaminants. <br />• Prepare conceptual schematics for alternative disinfection systems. <br />• Develop an OPCC and projected O &M costs for alternative disinfection systems. <br />• Filtration process assessment. <br />o Evaluate the effectiveness of constructed wetlands and alternative methods of <br />filtering stored reclaimed water before disinfection. <br />• Prepare conceptual schematics for alternative filtration systems. <br />• Develop an OPCC and projected O &M costs for alternative filtration systems. <br />Reclaimed Water Conveyance <br />Develop and /or refine design alignment options and alternatives and refine University <br />demand projections. The initial alignment will be determined after initial utility and base <br />map review. This will be reviewed with City for coordination and/or changes as <br />applicable. Once the alignment is surveyed and actual field locations are verified then <br />RPS will review the alignment for changes as applicable and present those to the City for <br />final design alignment. <br />Develop preliminary electrical design and SCADA modifications for the University <br />delivery vault, reclaimed water pump station pump addition, and low -head pumping for <br />reclaimed water storage. <br />Reclaimed Water Storage <br />• RPS will use the results of the ASR Phase 1 Feasibility Assessment in a comparison with <br />a surface reservoir. <br />• The surface reservoir will be of a curvilinear design with no public or park facilities or <br />amenities and will not include constructed wetlands or an ecological ladder design. <br />Deliverables: Draft PER — four (4) copies. <br />Draft PER submittal to TWDB. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.