Attachment C <br />Estimated Fee and Fee Schedule <br />3 - Schedule and fee estimate 04 04 2015.xlsx <br />Sr. PM <br />QA/QC Sr. Eng. <br />Eng. <br />CAD <br />Admin Subconsultant <br />Total <br />Task <br />1 Project Management <br />a <br />Project Initiation Meeting <br />12 <br />4 <br />4 <br />$ <br />3,336 <br />b <br />Project Progress Meetings (16 mtgs) <br />64 <br />36 <br />$ <br />18,819 <br />c <br />Design Workshop <br />8 <br />8 <br />8 <br />16 <br />2 <br />$ <br />7,467 <br />d <br />Public Meetings (2 Mtgs) <br />8 <br />16 <br />8 <br />2 <br />$ <br />5,541 <br />e <br />TWDB Funding Assistance <br />48 <br />$ <br />10,299 <br />f <br />Direct Project Expenses <br />$ <br />5,600 <br />Subtotal - Project Management <br />140 <br />0 <br />44 <br />28 <br />24 <br />8 S <br />- <br />S <br />51,062 <br />Task 2 Data Collection and Permitting <br />a <br />TxDOT Permitting <br />8 <br />24 <br />8 <br />2 <br />$ <br />6,504 <br />b <br />ASR Feasibility Assessment - Phase 1 <br />116 <br />$ <br />24,890 <br />c <br />Reclaimed Water Pump Evaluation <br />8 <br />$ <br />1,717 <br />d <br />Environmental Constraints Review <br />8 <br />$ <br />5,799 <br />$ <br />7,516 <br />e <br />Cultural Resources Review & Survey <br />8 <br />$ <br />9,576 <br />$ <br />11,292 <br />f <br />Environmental Information Document (EID) <br />24 <br />$ <br />15,352 <br />$ <br />20,501 <br />g <br />EID Public Review & Public Hearing <br />40 <br />$ <br />8,583 <br />h <br />Coordinate Agency Review of EID <br />40 <br />24 <br />$ <br />11,471 <br />i <br />Utility Coordination <br />4 <br />16 <br />36 <br />8 <br />$ <br />9,211 <br />j <br />Geotech (preliminary) <br />4 <br />16 <br />$ <br />12,870 <br />$ <br />15,989 <br />k <br />Surveying <br />4 <br />16 <br />$ <br />69,909 <br />$ <br />73,028 <br />1 <br />SWPPP <br />2 <br />4 <br />24 <br />8 <br />2 <br />$ <br />5,781 <br />Subtotal - Data Collection & Permitting <br />166 <br />0 <br />51 <br />108 <br />24 <br />4 S <br />113,506 <br />S <br />196,483 <br />Task 3 <br />Preliminary Engineering (30% Design) <br />a <br />Disinfection process assessment <br />10 <br />$ <br />33,999 <br />$ <br />36,144 <br />b <br />Filtration process assessment <br />8 <br />$ <br />20,721 <br />$ <br />22,437 <br />c <br />30% design <br />10 <br />10 <br />43 <br />280 <br />220 <br />$ <br />21,394 <br />$ <br />113,643 <br />d <br />CSM Contract Documents <br />8 <br />8 <br />8 <br />4 <br />$ <br />4,090 <br />e <br />Technical Specifications <br />24 <br />12 <br />40 <br />80 <br />16 <br />$ <br />24,125 <br />f <br />OPCC (4 Total, incl Final) <br />8 <br />6 <br />12 <br />40 <br />24 <br />$ <br />5,269 <br />$ <br />20,058 <br />g <br />Preliminary Engineering Report <br />24 <br />8 <br />36 <br />64 <br />16 <br />$ <br />20,776 <br />Subtotal - Preliminary Design <br />40 <br />18 <br />60 <br />128 <br />24 <br />20 S <br />81,382 <br />S <br />241,274 <br />Task 4 <br />Final Engineering Design (60 %, 90 %, 100% Design) <br />a <br />Geotech (final) <br />4 <br />8 <br />$ <br />45,870 <br />$ <br />47,859 <br />b <br />Subsurface Utility Engineering (SUE) <br />2 <br />$ <br />13,750 <br />$ <br />14,179 <br />c <br />Surveying (location of bones & env. features) <br />2 <br />2 <br />$ <br />4,942 <br />$ <br />5,801 <br />d <br />60% design (conveyance) <br />8 <br />8 <br />25 <br />222 <br />163 <br />$ <br />56,529 <br />$ <br />116,319 <br />e <br />60% design (storage) <br />2 <br />6 <br />22 <br />58 <br />56 <br />$ <br />11,000 <br />$ <br />32,444 <br />f <br />90% design (conveyance) <br />8 <br />8 <br />23 <br />202 <br />151 <br />$ <br />54,884 <br />g <br />90% design (storage) <br />2 <br />2 <br />18 <br />58 <br />56 <br />$ <br />19,669 <br />It <br />100% design (conveyance) <br />3 <br />1 <br />8 <br />67 <br />50 <br />$ <br />18,003 <br />i <br />100% design (storage) <br />1 <br />1 <br />6 <br />19 <br />19 <br />$ <br />6,556 <br />j <br />Pre -Bid Conference (1) <br />4 <br />8 <br />24 <br />$ <br />5,966 <br />k <br />Bid Assistance & Addenda <br />4 <br />8 <br />24 <br />8 <br />3 <br />$ <br />7,139 <br />1 <br />Bid Opening & Evaluation <br />4 <br />12 <br />24 <br />4 <br />$ <br />7,104 <br />Subtotal - Final Engineering <br />35 <br />15 <br />130 <br />697 <br />504 <br />7 S <br />132,091 <br />S <br />335,924 <br />Total Basic Services <br />481 <br />43 <br />286 <br />961 <br />576 <br />39 S <br />326,979 <br />S <br />824,742 <br />3 - Schedule and fee estimate 04 04 2015.xlsx <br />