My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2015 11:00:13 AM
Creation date
6/15/2015 1:51:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-60
Date
6/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(but not legal) advice in bid protest situations. It is assumed that this Project will be bid as one <br />Project and neither party anticipates that it will be necessary to re -bid the Project. <br />1.4.5 Have no authority to issue a Notice to Proceed to any Contractor. <br />1.4.6 Provide the City with two half size and two full size sets of conformed construction plans. <br />Provide the Contractor with three half size and two full size sets of conformed construction plans <br />at no additional cost to the City. <br />1.5 TASK 5 - CONSTRUCTION ADMINISTRATION <br />The Construction phase of this Project will commence with the award of the construction <br />contract and will terminate when the Project is accepted by the City. During the construction phase <br />of this project, the Architect will: <br />Construction Administration <br />1.5.1 Provide administration of the construction contract as set forth in the construction <br />documents unless otherwise provided in this Agreement and incorporated in the construction <br />contract documents. Architect will not pursue a course of conduct, which might jeopardize any <br />of the City's rights hereunder. Minor deviations from the construction contract documents that do <br />not affect the validity of performance bond(s) are permitted. <br />1.5.2 Be a representative but not an agent of the City during the construction phase, and advise <br />and consult with the City and provide progress reports and advice to the City in writing; serve as <br />the City's direct contact with the Contractor and forward the City's instructions to the Contractor <br />unless (1) Architect is unavailable by telephonic communication or otherwise to issue instructions <br />necessary for the proper progress and acceptance of work; (2) jeopardy to life and/or property <br />exists; and/or (3) lack of instructions and/or unavailability of Architect will result in, in City's <br />opinion, harm to City, in which case instructions may be forwarded directly to the Contractor by <br />the City; have authority to act on behalf of the City only to the extent provided herein and in the <br />construction contract documents unless otherwise modified by written instrument in accordance <br />with Section 12.1. Any instructions issued directly by City to the Contractor will be promptly <br />communicated to the Architect if the Architect was unavailable at the time of issuance of <br />instructions. <br />1.5.3 Assist the City in conducting a pre - construction conference with the Contractor, members <br />of City's staff, representatives of affected utility providers, and federal and state agencies having <br />jurisdiction over the Project (including City inspectors) in order to establish construction schedules <br />and to identify key representatives of the parties and lines of communication. The Architect will <br />be responsible for providing an agenda and for keeping accurate minutes of this meeting. The <br />Architect will distribute minutes to the interested parties within five calendar days of the <br />BRW - -- San Marcos Fire Station No.4 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.