My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2015 11:00:13 AM
Creation date
6/15/2015 1:51:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-60
Date
6/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f) Statement of Probable Cost. Provide a statement of probable cost at the completion of <br />schematic design, which will be a general estimate developed from several cost data <br />bases in order to determine the cost of the Project per square foot. The Architect will <br />provide the City with a pdf copy of the estimate. <br />g) Proposed Building Features. Design of the Project that consists of three to four truck <br />bays, sleeping room for eight, dayroom, kitchen, eating area, showers and fully <br />equipped bathrooms, support areas off the truck bays, and exercise area. <br />h) Analyze Office Furniture Feasibility. Interview City staff and based on these <br />interviews analyze the need for different types and sizes of office space. The City will <br />provide the Architect with estimated future growth projections for City staff. In <br />addition, the Architect will provide an analysis and layout of individual offices, cubicle <br />offices with modular furniture, or a combination of both as requested by the City. <br />i) Presentations. Make necessary presentations to the City Council for its approval of the <br />design. <br />1.1.14 Landscape. Prepare a landscape design to meet City zoning ordinance requirements as <br />applicable and that uses drought - tolerant native vegetation. In addition, the Architect will provide <br />a landscape design adjacent to designated structures and an irrigation system design and documents <br />to meet City ordinance requirements. <br />1.1.15 Civil. Perform civil design to include: <br />a) Design parking, sidewalks, driveway hard - scaped and gravel surfaces; <br />b) Detention pond; <br />b) Drainage and grading design at F contours; <br />c) Spot elevations at flatwork adequate for TAS compliance; <br />d) On -site water and sewer utilities; <br />1.1.16 Geology Surygy. Perform a geology survey to identify recharge features and meet TCEQ <br />submittal requirements <br />1.1.17 Base Phase I ESA Services. Perform an Environmental Sight Assessment ( "ESA ") <br />consistent with the procedures included in ASTM E1527 -13, Standard Practice for Environmental <br />Site Assessments: Phase I Environmental Assessment Process. The purpose of the ESA is to assist <br />the City in developing information to identify Recognized Environmental Conditions ( "REC ") in <br />connection with the site as reflected by the scope of this proposal. <br />1.2 TASK 2 — DESIGN DEVELOPMENT <br />The Architect will: <br />1.2.1 Design Development. <br />BRW San Marcos Fire Station No.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.