Laserfiche WebLink
a) Meet with the City as necessary to discuss design. <br />b) Upon completion of schematic design, provide design development documents based <br />on the approved schematic design documents and probable cost of the work. The <br />design development documents will illustrate and describe the refinement of the design <br />of the Project and will establish the scope, relationships, forms, size and appearance of <br />the Project through plans, sections and elevations, typical construction details, and <br />outline specifications. The Architect will include quality levels for major materials and <br />Project systems in the design development documents. <br />c) During the design process, work with the City to coordinate the scope of the Project. <br />At the completion of Design Development, the Architect will update the estimate of <br />probable cost of the work and the Project schedule. The Architect will advise the City <br />of any changes from previous estimated cost projections due to adjustments in the <br />Project scope, refinement of the estimate of the probable cost of the work or general <br />market conditions. <br />d) Provide preliminary mechanical, plumbing, electrical, and data engineering design <br />documents. Coordinate the communication lines, telephones and technology <br />information network (ICT) in coordination with the assigned City of San Marcos <br />Technology Project Manager. Perform minimal structural engineering services in <br />order to analyze the foundation and preliminary steel structure of the building. During <br />this task the Architect will develop interior elevations and will review finish materials, <br />lighting and furniture. The Architect will review with the City the equipment and <br />furniture that will be supplied by the City versus items that will be supplied by the <br />Contractor during construction through the construction contract. In addition, the <br />Architect will outline and review door hardware for recommendation to the City. and <br />will prepare an outline for materials and products to be included in the construction <br />specifications. <br />e) Provide mechanical, plumbing and electrical engineering services as part of this task <br />consisting of mechanical systems, including temperature control systems and written <br />sequence of operations; fire protection (sprinkler system) performance specification, <br />electrical power, lighting and fire alarm systems; coordination with utility companies <br />for electrical power, telephone, cable television, etc., and service entrances; emergency <br />generator, lightning protection (performance specification), radio system, antenna and <br />alerting systems, all in accordance with the City's applicable codes, regulations and <br />standards. <br />1.2.2 Prepare and submit all paperwork necessary for the City to obtain all applicable permits <br />and approvals from the appropriate agencies affected by the Project prior to construction. <br />1.2.3 Prepare specifications to include the bid document in Word format, special provisions, and <br />technical specifications. <br />BRW — San Marcos Fire Station No.4 <br />6 <br />