My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2015 11:00:13 AM
Creation date
6/15/2015 1:51:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-60
Date
6/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a) Meet with the City as necessary to discuss design. <br />b) Upon completion of schematic design, provide design development documents based <br />on the approved schematic design documents and probable cost of the work. The <br />design development documents will illustrate and describe the refinement of the design <br />of the Project and will establish the scope, relationships, forms, size and appearance of <br />the Project through plans, sections and elevations, typical construction details, and <br />outline specifications. The Architect will include quality levels for major materials and <br />Project systems in the design development documents. <br />c) During the design process, work with the City to coordinate the scope of the Project. <br />At the completion of Design Development, the Architect will update the estimate of <br />probable cost of the work and the Project schedule. The Architect will advise the City <br />of any changes from previous estimated cost projections due to adjustments in the <br />Project scope, refinement of the estimate of the probable cost of the work or general <br />market conditions. <br />d) Provide preliminary mechanical, plumbing, electrical, and data engineering design <br />documents. Coordinate the communication lines, telephones and technology <br />information network (ICT) in coordination with the assigned City of San Marcos <br />Technology Project Manager. Perform minimal structural engineering services in <br />order to analyze the foundation and preliminary steel structure of the building. During <br />this task the Architect will develop interior elevations and will review finish materials, <br />lighting and furniture. The Architect will review with the City the equipment and <br />furniture that will be supplied by the City versus items that will be supplied by the <br />Contractor during construction through the construction contract. In addition, the <br />Architect will outline and review door hardware for recommendation to the City. and <br />will prepare an outline for materials and products to be included in the construction <br />specifications. <br />e) Provide mechanical, plumbing and electrical engineering services as part of this task <br />consisting of mechanical systems, including temperature control systems and written <br />sequence of operations; fire protection (sprinkler system) performance specification, <br />electrical power, lighting and fire alarm systems; coordination with utility companies <br />for electrical power, telephone, cable television, etc., and service entrances; emergency <br />generator, lightning protection (performance specification), radio system, antenna and <br />alerting systems, all in accordance with the City's applicable codes, regulations and <br />standards. <br />1.2.2 Prepare and submit all paperwork necessary for the City to obtain all applicable permits <br />and approvals from the appropriate agencies affected by the Project prior to construction. <br />1.2.3 Prepare specifications to include the bid document in Word format, special provisions, and <br />technical specifications. <br />BRW — San Marcos Fire Station No.4 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.