My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-114/Professional Services Agreement between the City and CH2M Hill Engineers, Inc. for the provision of Professional Engineering Services in connection with the miscellaneous improvements at the San Marcos Wastewater Treatment Plant Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-114/Professional Services Agreement between the City and CH2M Hill Engineers, Inc. for the provision of Professional Engineering Services in connection with the miscellaneous improvements at the San Marcos Wastewater Treatment Plant Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 9:22:15 AM
Creation date
9/10/2015 2:37:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-114
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b) Determine Earthwork requirements: Pipe bedding, zone, and backfill requirements; <br />minimum depths; disposal of excess trench materials; finished grading, drainage, and re- <br />vegetation requirements. <br />c) Determine location, spacing, and sizing criteria for pipeline appurtenances. <br />d) Determine road crossing requirements and develop details. <br />e) Determine requirements for casings, concrete encasements, and utility crossing support. <br />f) Prepare pipeline Standard Details and Master Specifications. <br />3. Pump Station to include: <br />a) Hydraulic Analysis. Refine and update the system hydraulic analysis conducted during the <br />evaluation. Review existing pump information and curves. Develop new system curves. <br />Define pump operating points and ranges (flows and heads) and determine horsepower <br />requirements. Coordinate this effort with the pipeline hydraulic analysis. <br />b) Review existing wet well configuration and Hydraulic Institute criteria for pump stations. <br />Identify required modifications or upgrades needed at the wet well for proper operation of <br />the pumps and optimization of available water storage. It is assumed no computational <br />fluid dynamics (CFD) modeling or physical modeling is required for this task. <br />c) Identify modifications of the pumps and pumps' electrical equipment needed based upon <br />hydraulic analysis and wet well configuration modifications. <br />d) Operation and Control. Review operation and control functions, features, parameters, and <br />equipment for station including PLCs, SCADA, communications, pump start/stop <br />sequencing, etc. Prepare preliminary piping and instrumentation drawings (P &IDs), <br />control narratives, and lists of required features, functions, and equipment. <br />e) Prepare technical specifications for major equipment items. Anticipated items pump and <br />motor improvements, hydropneumatic tank, major valves and operators, and control <br />equipment. <br />f) Develop structural and mechanical plans and sections of pipeline and pump station. <br />g) Develop electrical and instrumentation plans and details, modifications to existing one - <br />line and typical MCC sections and wiring diagrams. <br />h) Identify erosion control measures that will be required in the contractor's erosion control <br />plan for the project. <br />E. Task 5 — Secondary Clarifier Crack Repairs <br />Identify the types of cracks the basins have and what repair systems will work best for the <br />type of cracks to include the following subtasks. Based upon current observations this only <br />includes clarifier no. 1 and clarifier no. 2. <br />a) Drain each clarifier and make a site visit to inspect cracks. <br />b) Measure and make an estimate of how many linear feet of repair is needed. <br />c) Based upon crack types, i.e. horizontal or vertical, identify repair products. <br />d) Develop specifications for products, acceptable methods of application, testing <br />requirements, and performance requirements and warranties. <br />CITY HALL a 630 EAST HOPKINS ® SAN MARCOS, TEXAS 78666 ® 512.393.8150 ® FACSIMILE 855.759 -2846 <br />SANMARCOSTX.GOV <br />
The URL can be used to link to this page
Your browser does not support the video tag.