My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-114/Professional Services Agreement between the City and CH2M Hill Engineers, Inc. for the provision of Professional Engineering Services in connection with the miscellaneous improvements at the San Marcos Wastewater Treatment Plant Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-114/Professional Services Agreement between the City and CH2M Hill Engineers, Inc. for the provision of Professional Engineering Services in connection with the miscellaneous improvements at the San Marcos Wastewater Treatment Plant Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 9:22:15 AM
Creation date
9/10/2015 2:37:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-114
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F. Task 6 - Design Review Workshop. Conduct a design review workshop with the City's <br />personnel and key individuals from the Engineer's project team; the design review workshop <br />will be conducted when the design is 30% complete. <br />G. Task 7 - Construction Cost Estimate. Prepare an estimate of the construction costs (AACE <br />Class 2 level) following completion of the design and provide the City with a summary of the <br />construction cost estimate. <br />H. Task 8 — Deliverables. <br />1. Provide the following: <br />a) Three sets all final plans and specifications. Plans will be D size, 22- by 34 -inch <br />format. All scalable plans will have a graphic scale -bar on each individual sheet. <br />b) One electronic copy of plans and specifications in PDF format. <br />c) Two copies of the itemized cost estimate for construction of the project. <br />2. Based on the City's and the Engineer's understanding of the Project, the level of effort has <br />been developed assuming the following list of drawings (total of 29) are required: <br />SHEET <br />NO. DWG NO. DESCRIPTION FACILITY <br />0001 <br />G -1 <br />Cover /Index <br />0002 <br />G -2 <br />General Notes <br />0003 <br />G -3 <br />Abbreviations <br />0004 <br />G -4 <br />Civil Legend <br />0005 <br />G -5 <br />Civil Legend <br />0006 <br />G -6 <br />Mechanical Legend <br />0007 <br />G -7 <br />Electrical Legend <br />0008 <br />G -8 <br />I &C Legend <br />0009 <br />G -9 <br />I &C Legend <br />C -1 <br />Pipeline Plan <br />Non- Potable <br />0010 <br />S stem <br />Y <br />C -2 <br />Pipeline Plan <br />Non - Potable <br />0011 <br />System <br />SM -1 <br />Mech Pump Station <br />Non - Potable <br />0012 <br />System <br />SM -2 <br />Mech Pump Station <br />Non- Potable <br />0013 <br />System <br />SM -3 <br />Hydro Tank Mech <br />Non- Potable <br />0014 <br />1 <br />System <br />CITY HALL a 630 EAST HOPKINS ® SAN MARCOS, TEXAS 78666 ® 512.393.8150 ® FACSIMILE 855.759 -2846 <br />SANMARCOSTX. GOV <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.