Laserfiche WebLink
CSJ # 0914 -33 -069 Fed.# STP 014(131)TE <br />District # AUS - 14 <br />Code Chart 64 # 02100 <br />Project: Cross -Town Pathway <br />Federal Highway Administration <br />CFDA # 20.205 <br />Not Research and Development <br />A. If the potential termination of the LPAFA is due to the failure of the Local Government to <br />fulfill its contractual obligations, the State will notify the Local Government that possible <br />breach of contract has occurred. The Local Government should make every effort to <br />remedy the breach within a period mutually agreed upon by both parties. <br />B. If the Local Government withdraws from the Project after the LPAFA is executed, it shall <br />be responsible for all direct and indirect Project costs as identified by the State's cost <br />accounting system. <br />C. A Project may be eliminated from the program as outlined below. If the Project is <br />eliminated for any of these reasons, this LPAFA will be appropriately terminated. A <br />project may be eliminated from the program if: <br />1. The Local Government fails to satisfy any requirements of the program rules cited as <br />43 TAC §11.200 et seq. <br />2. The implementation of the Project would involve significant deviation from the activities <br />as proposed in the nomination form. <br />3. The Local Government withdraws from participation in the Project. <br />4. This is a construction project and construction has not begun by August 31, 2016. <br />5. This is not a construction project and project activities have not been completed by <br />'20 <br />6. The State determines that federal funding may be lost due to the Project not being <br />implemented and completed. <br />7. Funds are not appropriated, in which case this LPAFA shall be terminated immediately <br />with no liability to either party. Payment under this LPAFA beyond the current fiscal <br />biennium is subject to availability of appropriated funds. <br />8. The Local Government fails to attend progress meetings at least twice yearly, as <br />scheduled by the State. <br />3. Amendments <br />Amendments of this LPAFA shall be made as described in the Master Agreement, without <br />exception. <br />4. Scope of Work, Use of Project, and Project Location <br />The scope of work for the Project, which is shown in Attachment B, the Project Location Map, <br />described in the nomination form and as approved by the Texas Transportation Commission, <br />consists of: constructing an approximately 2 mile long, 10 foot wide lighted pathway that will <br />begin on the west side of IH 35 extending to an existing trail that runs back toward the east. <br />From the west side of IH 35 near the San Marcos Visitor Center, the trail will travel west to the <br />Texas State University Campus Trail on Aquarena Springs and Charles Austin Drive. The <br />Pathway will provide a linkage between the City's Visitor's Center, University's Visitors <br />Center, River System Institute, , numerous parks, commercial downtown, and the high <br />density residential areas. <br />Any project changes proposed must be submitted in writing by the Local Government to the <br />State. Changes may also require an amendment to the LPAFA and the approval of the <br />Federal Highway Administration (FHWA), the State, or the Commission. Any changes <br />AFA —LPAFA TE Page 2 of 13 Rev. 01/17/2014 <br />