has made any examination to ascertain how and for what purpose the Contractor has used the <br />monies paid by the City. <br />1.6.10 Have authority to reject work, which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable for the <br />proper implementation of the intent of the construction contract documents, and with the approval <br />of the City, the Engineer will have authority to require special inspection or testing of the work in <br />accordance with the provisions of the construction contract documents, whether or not such work <br />is then fabricated, installed or completed. The Engineer will review the work and results of all <br />testing laboratories as required by the construction contract documents. <br />1.6.11 Review and make decisions regarding the approval or taking of other appropriate action <br />upon the Contractor's submittals, including, but not limited to, shop drawings, product data and <br />samples, schedule of values and progress schedule. The Engineer will take such action with <br />reasonable promptness, but generally not to exceed 15 calendar days or such period of time as will <br />not cause delay of the Project. <br />1.6.12 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and TxDOT and execution <br />in accordance with the construction contract documents. The Engineer will not issue change orders <br />not previously approved in writing by the City, and no course of conduct on the part of the Engineer <br />or the City will amend, waive or alter this provision. <br />1.6.13 Answer all Requests for Information from the Contractor, which may include technical <br />questions, clarifications and interpretations of the construction contract documents. <br />1.6.14 Conduct professional inspections to determine the dates of substantial completion and final <br />completion for the Project, to evaluate the work for acceptable conformance with the construction <br />contract documents and in light of any subsequent tests performed as referenced in the Section <br />1.6.9 to verify that any minor deviations from the construction contract documents as referenced <br />in Section 1.6.9 have been corrected and that the reasons for any specific qualifications in any and <br />all previous certificates for payment as described in the Agreement are either no longer valid or <br />the condition(s) and/or problem(s) have been corrected. The Engineer will receive and review <br />written warranties and related documents required by the construction contract documents and <br />assembled by the Contractor; will issue final certificates for payment or take other appropriate <br />action, and make a written recommendation to the City regarding the City's acceptance of the <br />project. <br />1.6.15 Require the submission by the Contractor, and subcontractors performing work on the <br />Project site, of periodic wage rate payment reports and, with the City's assistance, verify <br />compliance with federal and state wage rate requirements for the Project; and notice the City of <br />any noncompliance, or of the failure by the Contractor or subcontractors to make submissions. <br />REP Agreement for Cross -Town Pathway Project 9/1/2015 <br />8 <br />