My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-039
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2009 2:05:07 PM
Creation date
4/8/2009 9:31:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-39
Date
3/31/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACILITY SCHEDULE NO. 5 <br />1. Name: Redwood Substation <br />2. Facility Location: The Redwood Substation is located at 1375 Wonder World Drive, San <br />Marcos, Hays County, Texas. <br />3. Points of Interconnection: There are a total of twelve (12) points of interconnection at <br />Redwood Substation generally described as: <br />• where the 138 kV transformer bus connects to Operating Bus 41 for PWT-2. <br />• where the 138 kV transformer bus connects to Operating Bus 42 for PWT-2. <br />• where the incoming distribution line connects to the tubular bus between switches <br />RW-321 and RW-323 at breaker RW-320. <br />• where the jumper from breaker RW-320, passing through CT-15, connects to the 4 <br />hole pad on switch RW-319. <br />• where the jumper from breaker RW-320 connects to the 4 hole pad on switch RW- <br />321. <br />• where the incoming distribution line connects to the tubular bus between switches <br />RW-341 and RW-343 at breaker RW-340. <br />• where the jumper from breaker RW-340, passing through CT-11, connects to the 4 <br />hole pad on switch RW-339. <br />• where the jumper from breaker RW-340 connects to the 4 hole pad on switch RW- <br />341. <br />• where the jumper from switch RW-202 connects to the 12.5 kV Operating bus for <br />PWT-2, T-2. <br />• where the jumper from switch RW-205 connects to the 12.5 kV Transfer bus for <br />PWT-2, T-2. <br />• where the jumper from switch RW-102 connects to the 12.5 kV Operating bus for <br />PWT-2, T-2. <br />• where the jumper from switch RW-105 connects to the 12.5 kV Transfer bus for <br />PWT-2, T-2. <br />4. Transformation Services Provided by LCRA TSC: Yes <br />5. Metering Services Provided by LCRA TSC: Yes <br />6. Delivery Voltage: 138 kV for PWT-2; 12.5 kV for PWT-3 <br />7. Metered Voltage and Location: The metered voltage is 12.5 kV. The metering current <br />transformers are located in each individual bay. The metering potential transformers are <br />located on the 12.5 kV operating buses. <br />8. One Line Diagram Attached: Yes <br />LCRA TSC - San Marcos Electric Utility Page 27 of 35
The URL can be used to link to this page
Your browser does not support the video tag.