Laserfiche WebLink
4.4 From time to time, a Point of Interconnection may be added, changed, modified, or <br />deleted from this Agreement as mutually agreed by the Parties and/or as ordered by a regulatory <br />authority having jurisdiction thereof. Any such change, addition, or deletion shall be recorded in <br />Exhibit A and a Facility Schedule in such a way that the numbering of the other Facility Schedules is <br />not changed. <br />4.5 Subject to regulatory approval, if required, unless mutually agreed, neither party shall <br />have the right to disconnect from the other Party at any Point of Interconnection specified on Exhibit <br />A and a Facility Schedule, originally attached to this Agreement or added subsequent to the <br />execution of this Agreement, except for reason of a material violation of the terms of this <br />Agreement, for which opportunity to correct such violation was given under Paragraph 15.1 of this <br />Agreement and such violation was not corrected in accordance with said Paragraph 15.1. <br />4.6 For facilities not specified in the Facility Schedules, or if either Party makes <br />equipment changes or additions to the equipment at a Point of Interconnection, which may affect the <br />operation or performance of the other Party's interconnection facilities, the Parties agree to notify <br />the other Party, in writing, of such changes. Such changes shall be made in accordance with Good <br />Utility Practice, ERCOT requirements, the National Electrical Safety Code, other applicable codes, <br />and standards in effect at the time of construction, and coordinated between the Parties. <br />4.7 Each party agrees to provide current as-built drawings to the other Party of the <br />facilities owned by that Party at each Point of Interconnection. <br />4.8 The Parties agree to coordinate and cooperate on assessments of the reliability <br />impacts to the interconnected transmission system for new facilities requesting connection to <br />their distribution or transmission facilities, in accordance with the NERC Reliability Standards. <br />4.9 The City is responsible for reporting annual load data information to ERCOT as <br />required by the ERCOT Protocols and the Parties agree to coordinate and cooperate on <br />submitting this report <br />ARTICLE V - OTHER SERVICES <br />5.1 This Agreement is applicable onlyto the interconnection of the facilities of the Parties <br />at the Points of Interconnection and does not obligate either Parry to provide, or entitle either Party to <br />receive, any service not expressly provided for herein. Each Party is responsible for making the <br />arrangements necessary to receive any other service that either Party may desire from the other Party <br />or any third party. <br />5.2 All transmission, transformation, distribution, metering, operations, and maintenance, <br />engineering, billing or other miscellaneous services will be provided and charged under agreements <br />separate from this Agreement. <br />LCRA TSC - San Marcos Electric Utility Page 5 of 35