My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-039
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2009 2:05:07 PM
Creation date
4/8/2009 9:31:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-39
Date
3/31/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.3 Each Facility Schedule shall indicate whether transformation and/or metering services <br />apply at each Point of Interconnection. Parties agree that the name and location of the Points of <br />Interconnection in the Exhibit "A" and the Facilities Schedules attached to this Agreement, will be <br />identical to the name used and the location of the corresponding facilities in the Transformation <br />Service Agreement. <br />ARTICLE VI - SYSTEM OPERATION AND MAINTENANCE <br />6.1 Unless otherwise provided by the Facility Schedules, each Parry shall, at each Point <br />of Interconnection, at its own risk and expense, operate and maintain the facilities (including all <br />apparatus and necessary protective devices) it owns or hereafter may own, so as to reasonably <br />minimize the likelihood of voltage and frequency abnormalities, originating in the system of one <br />Party, from affecting or impairing the system of the other Party, or other systems to which the Party <br />is interconnected. The Parties agree that all Points of Interconnection will be operated and <br />maintained in conformance with operating guidelines of ERCOT and the ERCOT Protocols, as the <br />same may be amended hereafter. <br />6.2 Operational responsibility for facilities owned by one Party, but installed in another <br />Party's substation or transmission line will be identified in the Facility Schedule for that particular <br />Point of Interconnection. <br />6.3 During the term of this Agreement, the Parties will, consistent with maintaining good <br />operating practices, coordinate their operations to maintain continuity of services to their respective <br />customers to the extent practicable. Planned facility maintenance by either Party that will cause a <br />deviation from the normal power and energy flow at a Point of Interconnection will be scheduled at a <br />mutually agreeable time. No changes will be made in the normal operation of a Point of <br />Interconnection without the mutual agreement of the Parties. The Parties will, to the extent <br />necessary to support continuity of operations, coordinate the operation of protective devices on the <br />facilities they operate in the proximity of the Points of Interconnection which might reasonably be <br />expected to affect the operation of facilities on the other Party's system. <br />6.4 Each Parry will provide the reactive requirements for its own system in accordance <br />with the operating guides as established from time to time by ERGOT or its successor. Each Party <br />will provide the reactive requirements for its own system so as not to impose a burden on the other <br />system. <br />6.5 The City designates LCRA TSC to perform the functions of an "ERCOT <br />Transmission Operator" on the City's behalf as described in the ERCOT Protocols. As the <br />ERCOT Transmission Operator acting on behalf of the City, LCRA TSC shall have full authority <br />to perform any necessary load shedding, switching, and other transmission activities that are <br />deemed necessary to reliably maintain the electric system. <br />6.6 The City shall ensure that its operators designated to carry out dispatch <br />instructions from LCRA TSC are properly authorized and trained to comply with all reliability <br />directives issued by LCRA TSC, including shedding firn1 load, unless such actions would violate <br />LCRA TSC - San Marcos Electric Utility Page 6 of 35
The URL can be used to link to this page
Your browser does not support the video tag.