My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-041
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2009 3:38:06 PM
Creation date
4/8/2009 9:51:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-41
Date
3/31/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement. <br />1.0.5 Any provisions in this Agreement pertaining to the City's review, approval and/or <br />acceptance of written materials prepared by the Engineer and/or its subconsultants, contractors, <br />and subcontractors in connection with this Agreement will not diminish the Engineer's <br />responsibility for the materials. <br />1.0.6 The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />1.0.7 Scott A. Feldman, P.E., PTOE is the Engineer's Project Representative assigned to the <br />specific projects included under the terms of this Agreement. The Engineer will not substitute <br />another representative for these projects unless approved in writing by the City in advance of <br />such proposed substitution. In the event the City and the Engineer cannot agree to the <br />substitution of the Project Representative, the City may terminate this agreement in accordance <br />with Article 8. <br />1.1 TASK 1- PROJECT MANAGEMENT <br />For each Project as assigned by the City, the Engineer will: <br />1.1.1 Assemble a Project team comprised of the City's representatives and the Engineer's <br />representatives. The Engineer will meet with the Project team to set the production schedule and <br />parameters for all subsequent work, to verify the components within which all Project <br />participants must perform, and to identify all parties and significant deadlines involved in the <br />comprehensive schedule strategy. Based on this information, the Engineer will prepare a <br />detailed schedule of its work for the Project addressing each component of the work to be done, <br />indicating the points of involvement of all project participants. <br />1.1.2 Assist the City in connection with the City's responsibility for filing documents required <br />for the approval of governmental authorities having jurisdiction over the Project. <br />1.1.3 Perform general administrative duties associated with the Project, to include <br />monitoring/reporting, agendas/minutes, scheduling, general correspondence, office <br />administration, and invoicing. The Engineer will prepare and submit monthly progress reports <br />and invoices to the City for review and approval. <br />1.1.4 Maintain an "issues list" identifying the date the Project related issues become known, <br />the person(s) responsible for solution(s), date solution(s) will be provided, and final resolution of <br />the issue. <br />1.1.5 Participate in meetings with the City to include: <br />a) One initial kickoff meeting; <br />2
The URL can be used to link to this page
Your browser does not support the video tag.