My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-041
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2009 3:38:06 PM
Creation date
4/8/2009 9:51:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-41
Date
3/31/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b) No less than one progress meeting per month <br />1.1.6 Meet with the City's Project Manager periodically or as needed to update the City on the <br />progress of work. <br />1.1.7 Head the Project team and coordinate the integration of preliminary design issues, <br />surveying, right of way issues, traffic control issues, utility Engineering issues, ADA <br />compliance, permitting, and other services as previously approved and as applicable to the <br />preliminary engineering phase. <br />1.1.8 Prepare preliminary engineering documents based on approved design development <br />information and any further adjustments authorized by the City in the scope, quality or budget of <br />the Project. <br />1.1.9 Use its best professional judgment to create preliminary engineering documents that <br />comply with applicable construction and development codes, local regulations and ordinances <br />and other federal and state regulations which are known or which should reasonably be known to <br />the Engineer including, as applicable, those regulations required under the ADA and Article <br />9102, V.A.C.S., Architectural Barriers Act. In the event the ADA requirements are applicable to <br />a particular Project, the Engineer will be responsible for notifying the City of requirements of the <br />Architectural Barriers Act and any other requirements by the Texas Department of Licensing and <br />Regulation. <br />1.1.10 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement will be the subject of an application for copyright by or on behalf of the Engineer. <br />1.2 TASK 2 - PRELIMINARY DESIGN & SURVEY <br />For each Project as assigned by the City, the Engineer will: <br />1.2.1 Conduct monthly meetings with the City and other interested parties to review progress <br />on the Project. Both parties assume that preliminary design will last three months and that there <br />will be no more than four meetings included in this Task. The Engineer will prepare meeting <br />agendas for each meeting and distribute meeting minutes within five calendar days of each <br />meeting. <br />1.2.2 Surveying. Provide boundary, topographic, and construction surveying including, but not <br />limited to: <br />a) Contacting Dig-Tess utility locating service to have underground utilities marked and <br />labeled and surveyed; <br />b) Establishing Project control for topographic, boundary, and future construction layout <br />surveys; <br />c) Locating all above ground planimetric features, including, but not limited to edges of <br />asphalt and/or concrete, back of curb, culverts (flowlines of culverts and sizes), <br />mailboxes, driveways, sidewalks, ramps, retaining walls, signs (including sign type, <br />3
The URL can be used to link to this page
Your browser does not support the video tag.