My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-043
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2009 10:43:44 AM
Creation date
4/8/2009 10:14:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-43
Date
3/31/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Area Planning Council -GeoMap 2009 Work Order <br /> <br />mean all information and/or materials as may be defined in this Work Order required to be provided by <br />CAPCOG to Sanborn for the performance of the Services. <br />Once Sanborn has received full and final payment of all outstanding invoices with respect to the delivery <br />of the Sanborn Products hereunder, CAPCOG and its member entities shall have no restrictions on the <br />use and distribution thereof including to the public domain. Sanborn shall have not restrictions on the <br />use, distribution, licensing or sale thereof including any derivative products. <br />CAPCOG shall be responsible for evaluating and determining the adherence of the Sanborn Products to <br />the Acceptance Criteria or calculating error rates for the Deliverable units under this Work Order within <br />thirty (30) days of receipt. To the extent that CAPCOG assigns, delegates or subcontracts some or all of <br />this responsibility to any third party including its member entities ("Agent' such assignment or <br />contracting of the responsibility shall not relieve CAPCOG of responsibility and liability for all acts and <br />omissions which may constitute CAPCOG's default or breach of this Work Order. <br />CAPCOG's point of contact for Sanborn is: ........................................................................ Mr. Sean Moran <br />Sanborn's point of contact for CAPCOG is: ...................................................................... Mr. Andy Lucero <br />Execution of this Work Order by both parties shall constitute a notice to proceed with the production <br />and delivery of the Sanborn Products. <br />Project Scope <br />Sanborn shall produce 2-foot contours from previously collected Sanborn Product (FEMA grade LIDAR <br />data) as authorized under the GeoMap cooperative purchase agreement with CAPCOG and Sanborn as <br />defined per E bit A The responsibility for the delivery of the source information (LAS files with <br />intensity value and boundary limits in an ESRI shapefile) for the entire 286.51 square mile area of interest <br />(" ources'D and the suitability of those Sources for the intended nurooses he with APCOG and the Citv <br />of San Marcos. Sanborn will evaluate the Sources and advise if the Sources are adequate to meet the <br />requirements for deliveries as specified herein. <br />The Sanborn Product (2-foot Contours) deliverables for the entire project area will be delivered to <br />CAPCOG. It shall be CAPCOG's responsibility to distribute the data to its member constituents based <br />on the LA's. <br />LiDAR Contour Specifications / Sanborn Products <br />Contour Interval: <br />2-foot <br />Breakline Source <br />LAS files with intensity values <br />Breakline Features to be Collected <br />Sanborn shall utilize LiDARgrammetric procedures, where three-dimensional breaklines are produced <br />(coordinate line strings having x/y/z coordinates). Sanborn shall produce breaklines for stream <br />centerlines, drainage ditches, tops and bottoms of streambanks, ridge lines, road crowns, levees, <br />UnaOar Wana Pmpnna+y.021D07 The Sant4m LUp C"Wy. Ix. ALL R:GR'S RESERVED
The URL can be used to link to this page
Your browser does not support the video tag.