Laserfiche WebLink
Texas Department of Transportation <br />AUSTIN DISTRICT P.O. DRAWER 15426 AUSTIN, TEXAS 78761 -5426 <br />February 19, 2009 <br />Mr. Oscar Harrell <br />Director of Public Works <br />City of San Marcos <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br />Dear Mr. Harrell: <br />Enclosed are two unsigned original documents of a Multiple Use Agreement (MUA) between the <br />Texas Department of Transportation (TxDOT) and the City of San Marcos. This agreement is to <br />allow the City to install and maintain sidewalks and their associated drainage structures on the <br />west side of Loop 82 (Guadalupe St.) from the intersection with Grove St. to a distance of <br />approximately 1,200 feet north. <br />In order to submit this agreement for approval to the Maintenance Division of TxDOT we will <br />need a resolution or ordinance number entered on the front page along with the date of <br />resolution /ordinance approval. We will also need an authorized signature representing the City <br />of San Marcos on page 7 of the document. In the MUA documents I have highlighted in yellow <br />the lines where information will need to be entered by the City. Filling this information in by <br />hand is quite acceptable. <br />The City's resolution will need to clearly indicate its commitment to abide by the terms of the <br />Multiple Use Agreement and to maintain the sidewalk and associated drainage structures at no <br />cost to the State of Texas. Upon returning the signed documents I will also need a copy of your <br />approved resolution so I can attach it to the MUA as an exhibit. <br />You will note in these documents that Exhibits B, C, D, and E are currently empty. The project <br />plans and other information specified for these exhibits are not necessary at this time. I will <br />attach the proposed project plans (Exhibit B) when I send the MUA to the Maintenance Division <br />for their review. Exhibit C (the final approved construction plans) will be made part of the <br />document after Maintenance Division's approval of the MUA and before construction actually <br />begins. Likewise, Exhibit D (Certification of Insurance) will be added to the document prior to <br />actual construction. <br />Place this information and the signatures on both original documents and then return both <br />documents to the Austin District. Return the documents to the following address: <br />Texas Department of Transportation <br />Austin District, Maintenance Operations <br />P. O. Drawer 15426 <br />Austin, TX 78761 -5426 <br />AT-TN: Wayne Rehnborg <br />THE TEXAS PLAN <br />REDUCE CONGESTION • ENHANCE SAFETY • EXPAND ECONOMIC OPPORTUNITY • IMPROVE AIR QUALITY <br />INCREASE THE VALUE OF OUR TRANSPORTATION ASSETS <br />An Equal Opportunity Employer <br />