Laserfiche WebLink
rn <br />0 <br />0 0 <br />0 <br />in <br />0 <br />0 <br />z <br />w <br />v <br />i <br />Cc <br />•a <br />L <br />v <br />C <br />0 <br />a <br />a <br />0 <br />a <br />u) r a in <br />0 N <br />E 0 <br />C 0 <br />N <br />N <br />O c0 <br />0 0 <br />.o <br />V N <br />MD \ <br />O N <br />= <br />w w <br />J N <br />li <br />TEXAS DEPARTMENT OF TRANSPORTATION GENERAL NOTES <br />Basis of Estimate <br />Item <br />Description <br />Rate** <br />Basis <br />Quantity <br />160 <br />Monday through <br />Monday through <br />and 7 PM to 6 AM <br />Saturday & Sunday <br />166 <br />Topsoil <br />1 CY /SY <br />168 <br />Fert (13- 13 -13) <br />/sLB /SY <br />Veg Watering <br />(Item 162) <br />20 GAL /SY <br />SY <br />(Item 164) (Temp) <br />10 GAL /SY <br />SY <br />MG <br />204 <br />(Item 164) (Perm) <br />20 GAL /SY <br />SY <br />MG <br />Sprinkling <br />(Dust) <br />30 CAL /CY <br />(Item 132) <br />30 GAL /CY <br />210 <br />(Item 247) <br />30 GAL /CY <br />Roll (Flat Wheel) <br />(Item 247) <br />1 HR /200 TON <br />210 <br />(Item 316) <br />1 HR /6000 SY <br />Roll (Tamping) <br />210 <br />1 (Item 132) - <br />Roll (Heavy Tomp) <br />1_HR /200_CY - <br />210 <br />(Item 132) <br />1 HR /200 CY <br />Roll (Lt Pneu Tire) <br />(Item 132) <br />1 HR /500 CY <br />(Item 247) <br />1 HR /200 TON <br />(Item 316) (Seal Coat) <br />1 HR /6000 SY <br />340 <br />(Item 316) (Once Course) <br />1 HR /6000 SY <br />Dense-Graded Hot -Mix Asphalt (Method) <br />TY A SACE B PG 64 -22 <br />110 LB /SY /IN <br />SY <br />TONS <br />TY D SAC 8 PG 64 -22 <br />110 LB /SY /IN <br />SY <br />TONS <br />Accrue Contract time charges through the Contractor's completion of the final punchlist. <br />Match existing cross slopes, as directed. Consider subsidiary to the pertinent Items. <br />Provide o smooth, clean sawcut along the existing asphalt pavement structure, as directed. <br />Consider subsidiary to the pertinent Items. <br />Meet weekly with the Engineer to notify him or her of planned work for the upcoming week. <br />Blade the side slopes to remove all gross from the area of construction before placing flexible <br />base on that portion of the roadway to be widened, level -ups seal coat, or HMAC overlay. <br />Blade the sod back onto the side slopes after the proposed items of work have been completed. <br />Consider subsid'ary to pertinent Items. <br />Equip all construction equipment in roadway work with a permanently mounted 360° <br />revolving or strobe warningg light with amber lens. Light will have a minimum lens height and <br />m <br />diaeter of 5 in. and nounN19 height of not less than 6 ft. above the roadway surface and be <br />visible from all sides. Attach at each side of the rear end of the construction equipment an <br />approved orange warning flag mounted not less than 6 ft, above the roadway surface. <br />Overhead and underground utilities exist in the vicinity of the project. The exact location of <br />underground utilities is not known. Contact the Texas Excavation Safety. Systems (TESS) or <br />DIG TESS at 1- 800 - 344 -8377 or the area utility companies for exact locations at least 4B <br />hours before commencing any work that might affect present utilities. <br />Remove any construction debris and surplus material generated by the construction work <br />within the project limits. Perform this work as directed. Consider subsidiary to the pertinent Items. <br />Trim vegetation around signs and other obstructions. Consider subsidiary to pertinent Items. <br />Supply litter barrels in enough numbers at locations as directed to control litter within the project. <br />Consider subsidiary to pertinent Items. <br />Use a self - contained vacuum broom to sweep the roadway and Keep it free of sediment as directed. <br />Maintain one self- contained vacuum in good condition at the project site at all times unless otherwise <br />approved by the Engineer. <br />Protect all areas of the right of way which are not included in the actual limits of the proposed <br />construction areas from destruction. Exercise core to prevent damage to trees, vegetation, and <br />other natural surroundings. Areas not to be disturbed will be as directed. Restore any area disturbed <br />as a result of the Contractor a s operations to a condition as good as, or better before the beginning <br />of work. <br />All locations used for storing construction equipment, materials, and stockpiles of any type within the right <br />of way will be as directed. Use of right of way for these purposes will be restricted to those locations where <br />driver sight distance to businesses and side street intersections is not obstructed and at other locations where <br />an unsightly appearance will not exist. <br />The project superintendent shall be copable of speaking English and will be available on the project at all times <br />when work is being performed including subcontroctor work. The superintendent will be available and on call <br />24 hours a day. <br />No person or tool will be permitted within 8 feet of high voltage electrical lines (600 volts or greater) unless <br />arrangements have been made with the power company. No equipment will be permitted within 10 feet of <br />high voltage, electrical lines unless there are warnings posted and on insulated guard is attached to the boom or <br />bucket. Notify the Engineer if there are any conflicts with high voltage electrical lines. <br />ITEM 7 - Legal Relations and Responsibilities <br />Do not leave equipment, after working hours, in a position that will endanger the traveling public. <br />Maintain positive drainage for permanent as well as temporary drainage during the duration of the project. This <br />work is the sole responsibility of the Contractor. Construct temporary and permanent systems prior to placement <br />of temporary or permanent pavement. Any items associated with the temporary /interim drainage and all related <br />maintenance shall be the Contractor,& s responsibility. No direct payment shall be made for this work. The <br />Engineer shall have final authority in determining the adequacy of any temporary or permanent drainage features <br />installed. <br />ITEM 8 - Prosecution and Proaress <br />Lane closure hours will be restricted to off -peak hours as defined in the following table. <br />Peak Hours <br />Off -Peak Hours <br />6 to 9:00 AM <br />4 to 7:00 PM <br />9 AM to 4 PM <br />7 AM to 7 PM <br />Monday through <br />Monday through <br />and 7 PM to 6 AM <br />Saturday & Sunday <br />Friday <br />Friday <br />Monday through <br />Friday <br />ITEM 100 132 & 160 - Preparing Right of Way, Embankment and Topsoil <br />Use hand methods or,otherp means to remove ebssubstatas� if doing work b <br />mechanical methods is impractical. y to he er inenT Items. <br />iTEM u2 - Embankment <br />Track ALL embankment slope* left idle for more, than 14 days, within or qt the <br />end of tYe 14 -day die period to prevent erosion. Trockina cons sts of operating <br />o tracked vehicle or equipmen4 uttz� and d wn the slope, leovlr�9 track marks <br />perpendicular tp the d rectlon of ,the s�ope. Tracking slopes to prevent erosion is <br />considered subs ?d ory to the pertinent tems. <br />Correct subgraadde (e. . uostoble dregs, soft spots, etc.) prior to the dumping of <br />Flexbose or HMACP. Consider subsidiary to the pertinent Items. <br />ITEM 132 y 400 - Embankment & Excavation and Backfill for Structures <br />All compaction equipment shall be approved prior to all bockfiIIing 0nd embonkment <br />operations., Dttochabie sh2epsfoot-ty a wheels mounted on becKhoes, trockhoes <br />and other siml or equipment will not ge allowed for compaction operations, including <br />pipe installation. <br />ITEM 160 - Topsoil <br />Obtain Approval of all topsoil sources before di ggg ing be ins. Ensure qff - site topsoil <br />has o minimum PI of 20, or as directed. The,Dep8rtm8nt �e 6rves the rigoht to takes <br />samples, as needed, to assure that the material meets the PI requ remenfs. <br />- -- Ob+ein- approve+ ef�-+he- eetue+ depth-ef -the *opse-i l- -seurees feF -be#h - on -si #e- end --Off—site <br />sources. <br />Construct topsoil stockpiles no more than five (5) feet in height. <br />Permissible to use topsoil dikes for erosion control berms within the right of way. <br />Track all embankment slopes left idle for more, than 14, days within pr at the end of the <br />14- day,idle period to prevent erosign. Tracking consists bf operating o tracked Vehicle <br />or equipment up crib down the slope le vinoa track marks perpendiculgr,to the direction <br />of the slope. Consider the tryacking sQopes to prevent erosion subsidiary to the pertinent Items. <br />Considinal grQdiorytt to theeper}ineh�kIalI topsoi led slopes to prevent erosion, as directed. <br />Providepmet$neeteItemsor payment of topsoil quantities before seeding. Consider subsidiary <br />ITEM 164- Seedina <br />Do not use ryegross for temporary cover. <br />Reseed all areas of little gr,no gross growth after one month, from the last seeding date, <br />as directed. cons der subs d ory to the pertinent Items. <br />ITEM 168 - Vegetation Waterina <br />Water all arenas of project to be seeded or sodded. a D <br />Mmney ii ate the aftedbadrQnn fQ�onontthe sqi fe of /j i n o or greate ,h but gw i I S-be Wroesume( con the so isle dries out. <br />Continue watering until final acceptance. <br />Obtain water at a source that is metered or fur i9sn the manufacturer's specifications showing the <br />tank Gepacity for eoth truck,usged. Notify the �ncanebe veaQh day that watering takes place, before <br />watering, so that me er reodin s or truck counts <br />Item 204 - Sprinkling <br />Apppl water for dust control ,os dir eted• When ou *t control is n t being maintained, cease operations <br />unti� dust control is maintained. Eonsider subsidiary to the pert nent Items. <br />Item 216 - Proof Rollins <br />MeseltorrEctigns and retest, to the satisfaction of the Engineer, when Initial Proof Rolling yields a failing <br />Cons der subs d ary to the pertinent Items. <br />, .............................. <br />JOHN G. FRIEDMAN <br />r .............................. <br />,•o_ 88486 .9 <br />kIotz4.� associates <br />CITY OF SAN MARCOS <br />SAN MARCOS SIDEWALK PROJECT <br />GUADALUPE STREET - SIDEWALK <br />GENERAL NOTES <br />KLOTZ ASSOCIATES INC. PROJECT NO. <br />0564.002.000 <br />STATE COUNTY <br />TEXAS HAYS <br />CITY OF SAN "RCOS REFERENCE NUMBER <br />RFP 26 -001 <br />3a <br />HIGHWAY NO. <br />LOOP 82 <br />