<br />TEXAS DEPARTMENT OF TRANSPORTATION GENERAL NOTES
<br />Basis of Estimate
<br />Item
<br />Description
<br />Rate**
<br />Basis
<br />Quantity
<br />160
<br />Monday through
<br />Monday through
<br />and 7 PM to 6 AM
<br />Saturday & Sunday
<br />166
<br />Topsoil
<br />1 CY /SY
<br />168
<br />Fert (13- 13 -13)
<br />/sLB /SY
<br />Veg Watering
<br />(Item 162)
<br />20 GAL /SY
<br />SY
<br />(Item 164) (Temp)
<br />10 GAL /SY
<br />SY
<br />MG
<br />204
<br />(Item 164) (Perm)
<br />20 GAL /SY
<br />SY
<br />MG
<br />Sprinkling
<br />(Dust)
<br />30 CAL /CY
<br />(Item 132)
<br />30 GAL /CY
<br />210
<br />(Item 247)
<br />30 GAL /CY
<br />Roll (Flat Wheel)
<br />(Item 247)
<br />1 HR /200 TON
<br />210
<br />(Item 316)
<br />1 HR /6000 SY
<br />Roll (Tamping)
<br />210
<br />1 (Item 132) -
<br />Roll (Heavy Tomp)
<br />1_HR /200_CY -
<br />210
<br />(Item 132)
<br />1 HR /200 CY
<br />Roll (Lt Pneu Tire)
<br />(Item 132)
<br />1 HR /500 CY
<br />(Item 247)
<br />1 HR /200 TON
<br />(Item 316) (Seal Coat)
<br />1 HR /6000 SY
<br />340
<br />(Item 316) (Once Course)
<br />1 HR /6000 SY
<br />Dense-Graded Hot -Mix Asphalt (Method)
<br />TY A SACE B PG 64 -22
<br />110 LB /SY /IN
<br />SY
<br />TONS
<br />TY D SAC 8 PG 64 -22
<br />110 LB /SY /IN
<br />SY
<br />TONS
<br />Accrue Contract time charges through the Contractor's completion of the final punchlist.
<br />Match existing cross slopes, as directed. Consider subsidiary to the pertinent Items.
<br />Provide o smooth, clean sawcut along the existing asphalt pavement structure, as directed.
<br />Consider subsidiary to the pertinent Items.
<br />Meet weekly with the Engineer to notify him or her of planned work for the upcoming week.
<br />Blade the side slopes to remove all gross from the area of construction before placing flexible
<br />base on that portion of the roadway to be widened, level -ups seal coat, or HMAC overlay.
<br />Blade the sod back onto the side slopes after the proposed items of work have been completed.
<br />Consider subsid'ary to pertinent Items.
<br />Equip all construction equipment in roadway work with a permanently mounted 360°
<br />revolving or strobe warningg light with amber lens. Light will have a minimum lens height and
<br />m
<br />diaeter of 5 in. and nounN19 height of not less than 6 ft. above the roadway surface and be
<br />visible from all sides. Attach at each side of the rear end of the construction equipment an
<br />approved orange warning flag mounted not less than 6 ft, above the roadway surface.
<br />Overhead and underground utilities exist in the vicinity of the project. The exact location of
<br />underground utilities is not known. Contact the Texas Excavation Safety. Systems (TESS) or
<br />DIG TESS at 1- 800 - 344 -8377 or the area utility companies for exact locations at least 4B
<br />hours before commencing any work that might affect present utilities.
<br />Remove any construction debris and surplus material generated by the construction work
<br />within the project limits. Perform this work as directed. Consider subsidiary to the pertinent Items.
<br />Trim vegetation around signs and other obstructions. Consider subsidiary to pertinent Items.
<br />Supply litter barrels in enough numbers at locations as directed to control litter within the project.
<br />Consider subsidiary to pertinent Items.
<br />Use a self - contained vacuum broom to sweep the roadway and Keep it free of sediment as directed.
<br />Maintain one self- contained vacuum in good condition at the project site at all times unless otherwise
<br />approved by the Engineer.
<br />Protect all areas of the right of way which are not included in the actual limits of the proposed
<br />construction areas from destruction. Exercise core to prevent damage to trees, vegetation, and
<br />other natural surroundings. Areas not to be disturbed will be as directed. Restore any area disturbed
<br />as a result of the Contractor a s operations to a condition as good as, or better before the beginning
<br />of work.
<br />All locations used for storing construction equipment, materials, and stockpiles of any type within the right
<br />of way will be as directed. Use of right of way for these purposes will be restricted to those locations where
<br />driver sight distance to businesses and side street intersections is not obstructed and at other locations where
<br />an unsightly appearance will not exist.
<br />The project superintendent shall be copable of speaking English and will be available on the project at all times
<br />when work is being performed including subcontroctor work. The superintendent will be available and on call
<br />24 hours a day.
<br />No person or tool will be permitted within 8 feet of high voltage electrical lines (600 volts or greater) unless
<br />arrangements have been made with the power company. No equipment will be permitted within 10 feet of
<br />high voltage, electrical lines unless there are warnings posted and on insulated guard is attached to the boom or
<br />bucket. Notify the Engineer if there are any conflicts with high voltage electrical lines.
<br />ITEM 7 - Legal Relations and Responsibilities
<br />Do not leave equipment, after working hours, in a position that will endanger the traveling public.
<br />Maintain positive drainage for permanent as well as temporary drainage during the duration of the project. This
<br />work is the sole responsibility of the Contractor. Construct temporary and permanent systems prior to placement
<br />of temporary or permanent pavement. Any items associated with the temporary /interim drainage and all related
<br />maintenance shall be the Contractor,& s responsibility. No direct payment shall be made for this work. The
<br />Engineer shall have final authority in determining the adequacy of any temporary or permanent drainage features
<br />installed.
<br />ITEM 8 - Prosecution and Proaress
<br />Lane closure hours will be restricted to off -peak hours as defined in the following table.
<br />Peak Hours
<br />Off -Peak Hours
<br />6 to 9:00 AM
<br />4 to 7:00 PM
<br />9 AM to 4 PM
<br />7 AM to 7 PM
<br />Monday through
<br />Monday through
<br />and 7 PM to 6 AM
<br />Saturday & Sunday
<br />Friday
<br />Friday
<br />Monday through
<br />Friday
<br />ITEM 100 132 & 160 - Preparing Right of Way, Embankment and Topsoil
<br />Use hand methods or,otherp means to remove ebssubstatas� if doing work b
<br />mechanical methods is impractical. y to he er inenT Items.
<br />iTEM u2 - Embankment
<br />Track ALL embankment slope* left idle for more, than 14 days, within or qt the
<br />end of tYe 14 -day die period to prevent erosion. Trockina cons sts of operating
<br />o tracked vehicle or equipmen4 uttz� and d wn the slope, leovlr�9 track marks
<br />perpendicular tp the d rectlon of ,the s�ope. Tracking slopes to prevent erosion is
<br />considered subs ?d ory to the pertinent tems.
<br />Correct subgraadde (e. . uostoble dregs, soft spots, etc.) prior to the dumping of
<br />Flexbose or HMACP. Consider subsidiary to the pertinent Items.
<br />ITEM 132 y 400 - Embankment & Excavation and Backfill for Structures
<br />All compaction equipment shall be approved prior to all bockfiIIing 0nd embonkment
<br />operations., Dttochabie sh2epsfoot-ty a wheels mounted on becKhoes, trockhoes
<br />and other siml or equipment will not ge allowed for compaction operations, including
<br />pipe installation.
<br />ITEM 160 - Topsoil
<br />Obtain Approval of all topsoil sources before di ggg ing be ins. Ensure qff - site topsoil
<br />has o minimum PI of 20, or as directed. The,Dep8rtm8nt �e 6rves the rigoht to takes
<br />samples, as needed, to assure that the material meets the PI requ remenfs.
<br />- -- Ob+ein- approve+ ef�-+he- eetue+ depth-ef -the *opse-i l- -seurees feF -be#h - on -si #e- end --Off—site
<br />sources.
<br />Construct topsoil stockpiles no more than five (5) feet in height.
<br />Permissible to use topsoil dikes for erosion control berms within the right of way.
<br />Track all embankment slopes left idle for more, than 14, days within pr at the end of the
<br />14- day,idle period to prevent erosign. Tracking consists bf operating o tracked Vehicle
<br />or equipment up crib down the slope le vinoa track marks perpendiculgr,to the direction
<br />of the slope. Consider the tryacking sQopes to prevent erosion subsidiary to the pertinent Items.
<br />Considinal grQdiorytt to theeper}ineh�kIalI topsoi led slopes to prevent erosion, as directed.
<br />Providepmet$neeteItemsor payment of topsoil quantities before seeding. Consider subsidiary
<br />ITEM 164- Seedina
<br />Do not use ryegross for temporary cover.
<br />Reseed all areas of little gr,no gross growth after one month, from the last seeding date,
<br />as directed. cons der subs d ory to the pertinent Items.
<br />ITEM 168 - Vegetation Waterina
<br />Water all arenas of project to be seeded or sodded. a D
<br />Mmney ii ate the aftedbadrQnn fQ�onontthe sqi fe of /j i n o or greate ,h but gw i I S-be Wroesume( con the so isle dries out.
<br />Continue watering until final acceptance.
<br />Obtain water at a source that is metered or fur i9sn the manufacturer's specifications showing the
<br />tank Gepacity for eoth truck,usged. Notify the �ncanebe veaQh day that watering takes place, before
<br />watering, so that me er reodin s or truck counts
<br />Item 204 - Sprinkling
<br />Apppl water for dust control ,os dir eted• When ou *t control is n t being maintained, cease operations
<br />unti� dust control is maintained. Eonsider subsidiary to the pert nent Items.
<br />Item 216 - Proof Rollins
<br />MeseltorrEctigns and retest, to the satisfaction of the Engineer, when Initial Proof Rolling yields a failing
<br />Cons der subs d ary to the pertinent Items.
<br />, ..............................
<br />JOHN G. FRIEDMAN
<br />r ..............................
<br />,•o_ 88486 .9
<br />kIotz4.� associates
<br />CITY OF SAN MARCOS
<br />SAN MARCOS SIDEWALK PROJECT
<br />GUADALUPE STREET - SIDEWALK
<br />GENERAL NOTES
<br />KLOTZ ASSOCIATES INC. PROJECT NO.
<br />0564.002.000
<br />STATE COUNTY
<br />TEXAS HAYS
<br />CITY OF SAN "RCOS REFERENCE NUMBER
<br />RFP 26 -001
<br />3a
<br />HIGHWAY NO.
<br />LOOP 82