My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-053
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:30:48 PM
Creation date
4/13/2009 8:55:21 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-53
Date
4/7/2009
Volume Book
181
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C <br />a, <br />v <br />v <br />w <br />0 <br />0 <br />z <br />I <br />w <br />i <br />C <br />C <br />0 <br />L <br />a <br />ID <br />r <br />0 <br />Y <br />0 <br />W <br />ID <br />Vn <br />v <br />0 <br />u <br />U <br />i <br />C <br />0 <br />0 <br />i <br />uU <br />Y <br />0 <br />3 <br />a� <br />tn <br />a <br />a <br />0 <br />0 <br />CL <br />CL <br />o <br />a N <br />L .. <br />0 <br />� M <br />C N <br />a <br />In <br />N <br />O m <br />o <br />O O <br />N <br />Q N <br />lO \ <br />O N <br />7.L <br />w w <br />J F- <br />.r Q <br />�o <br />Asphalt shall be checked for correct depth and shall be overlapped at the <br />longitudinal joint 1 to 2 inches. Asphalt shall be placed and compacted in 2 lifts if <br />the designed thickness is 4 inches or more. <br />See city specifications for concrete installation <br />NOTE: This document is not meant or designed to be on inclusive document. This <br />function of this 'requirements' document was identified by the city inspection staff <br />based on daily field operations and common issues. It is the intent of this <br />document to facilitate the construction process in common overlapping areas <br />between city departments and private contractors. In all cases, contractors, <br />subcontractors and owners are responsible for knowing and utilizing the state, <br />federal or city codes and laws where applicable. No code violations are <br />"approved ". City of San Marcos signed or reviewed plans are not authorization to <br />violate codes, laws or ordinances. A copy of plans bearing a seal from the <br />Building Department is required to be available on -site at all times. Any changes <br />or revisions to these plans must first be submitted to the City by the design <br />professional for review and written authorization. A review seal from the (specific <br />to the change) Deportment of Engineering and the Building Department of these <br />e- ovorl- atr+t -on- 8ite- ot- 0++times.- - <br />GENERAL NOTES <br />1. PLAN LAYOUT SHOWS LOCATION OF PROPOSED <br />SIDEWALK. <br />2. PROPOSED SIDEWALK WILL HAVE MAX. 2% <br />CROSS SLOPE TOWARD THE ROADWAY. THE <br />SIDEWALK WILL HAVE A MAX. RUNNING <br />SLOPE OF 5 %. <br />3. THE PLAN LAYOUT SHOWS PROPOSED ELEVATION <br />SHOTS AT PERTINENT LOCATIONS OF NEW <br />SIDEWALK. ALSO PROPOSED LONGITUDINAL <br />GRADE ALONG NEW SIDEWALK ARE SHOWN <br />WITH ARROW HEAD TO INDICATE ADA <br />COMPLIANCY. <br />4. CONSTRUCTION OF PROPOSED <br />DRIVEWAYS WILL BE DONE USING <br />DAILY LANE CLOSURE. DAILY LANE <br />CLOSURE IS LIMITED TO THE OFF -PEAK <br />HOURS SHOWN IN THE PLANS. <br />5. FOR PROPOSED SIDEWALK, CURB RAMP <br />DRIVEWAY DETAILS, AND CURB AND <br />GUTTER SEE SIDEWALK DETAILS SHEET. <br />6. WHEN REMOVING VEGETATION (BRUSH, BUSHES, <br />TREES, ETC.) REMOVE ROOTS TO ENSURE <br />VEGETATION WILL NOT REGROW. <br />7. SEE APPROPRIATE BC STANDINGS FOR <br />DETERMINING LOCATION OF <br />CONSTRUCTION SIGNS. <br />8. UNLESS OTHERWISE NOTED, REVEGETATION WILL <br />BE DONE USING BERMUDA SOD WITHIN 1.5' BUFFER <br />FROM EDGE OF SIDEWALK ACCORDING TO <br />TxDOT SPECIFICATION. <br />9. TEMPORARY EROSION, SEDIMENT, AND WATER <br />POLLUTION CONTROL MEASURES SHALL BE <br />INSTALLED PRIOR TO CONSTRUCTION. <br />WATERING SCHEDULE <br />1. IMMEDIATELY AFTER THE AREA IS SODDED, <br />IT SHALL BE WATERED WITH A MINIMUM OF <br />5 GALLONS OF WATER PER SQUARE YARD <br />AND AT 10 DAY INTERVALS AT A MINIMUM <br />RATE OF 3 GALLONS PER SQUARE YARD <br />UNTIL FINAL ACCEPTANCE BY THE CITY <br />OR UNTIL THE GRASS UNIFORMLY REACHES <br />A HEIGHT OF 21 /2INCHES. <br />JOHN G. FRIEDM_ AN <br />o� • 088486• �,�e' <br />kIotzIl) ass oci ate s <br />CITY OF SAN MARCOS <br />SAN MARCOS SIDEWALK PROJECT <br />GUADALUPE STREET - SIDEWALK <br />GENERAL NOTES <br />4 OF 4 <br />KLOTZ ASSOCIATES INC. PROJECT NO. SN <br />NO <br />0564. 002. 000 <br />STATE COUNTY <br />TE HAYS <br />XAS <br />OF SAN MARCOS REFERENCE NUMBER HIGHWAY NO. <br />RFP 26 -001 1 LOOP 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.