My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-053
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:30:48 PM
Creation date
4/13/2009 8:55:21 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-53
Date
4/7/2009
Volume Book
181
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19. Notes General <br />- Water (fire) hydrants must be placed or moved to finished grade after installation. <br />- Water (fire) hydrants are required to be marked with a blue reflective marker 6" to <br />10" off center of the roadway, toward the hydrant. <br />- All hydrants should be finish painted or ordered in a silver color. <br />City will not perform tie -in function of a public line to o private line. It is the <br />responsibility of the owner or contractor to tie to the line provided by the city from <br />the public easement to the private property line. It is the licensed plumber /utility <br />contractor responsibility to maintain proper slope and connection of system to the <br />public connection. <br />- Water (fire) hydrants capable of producing the required GPM (based on <br />construction type) must be located within 500 foot of the most remote portion of <br />the building using accessible surfaced roadway for measurement. Hydrants must <br />be operational prior to storing or raising combustible material on job site. (This <br />distance may be reduced to 300 foot in some commercial applications) <br />- The tops of the valve stems ShoII be at Ieast 18" and no more than 36" below _ _ <br />finished grade. Note City of Son Marcos details for water valve boxes. <br />All individuals that enter an active wastewater manhole must wear a safety <br />harness connected to a mechanical retrieval device. <br />All installed pipe will have letters /numbers at the 12:00 positions when installed <br />The City will not perform the tie -in of lines to City owned and maintained lines or <br />clean -outs. It is the licensed plumber /utility contractor responsibility to maintain <br />proper slope, connection and drainage of system to the public connection. <br />See city details for all sewer /utility line installations. <br />DRIVEWAYS AND SIDEWALK <br />23. Inspection - All sidewalks and driveway approaches will be inspected by the City of <br />San Marcos. <br />Public <br />The Department of Engineering will inspect the following items: <br />_ _ _ _ All Public Works projects <br />- All commercial driveway approaches and sidewalks on lots and <br />- All iron pipe and fittings to be wrapped with at least 8 Mil Polyethylene Wrap. <br />projects larger than a three -plex <br />- All pipe bedding material and tracer tape shall conform to City of Son Marcos <br />- All sidewalk romps and access drives in new residential <br />undergoing new construction to street, curb, and <br />specifications. <br />subdivision <br />utilities. <br />- Existing valves in a city right -of -way will be operated by city personnel only. The <br />- Any extension or addition to a drive on existing property when <br />contractor may not operate any existing city owned valve. The general contractor <br />permitted by the Engineering Department only. <br />will be fined if an existing water valve is operated without express written consent <br />of the Water & Wastewater Utility Department, regardless of who operated the <br />Private <br />valve. <br />The Building Department will inspect the following: <br />- Only temporary water meters approved by the City of San Marcos authorized for <br />- All driveway approaches and sidewalks in new residential <br />use on any water (fire) hydrant (public or private). A fine will be imposed on <br />construction. (Includes residential lots up to and including three - <br />c <br />operators using water (fire) hydrants with unapproved meters or failing to use <br />plex) <br />approved back flow prevention or air gap protection. (copy of test report must be <br />24. Notes - General <br />submitted to the city water utility prior to activation) <br />- No water line can be plugged (deod- ended) more than 10ft. from the nearest fire <br />Meters, valves, or other utility obstructions are not permitted in sidewalks or <br />w <br />hydrant, tee, Dlowoff valve or service that can be used to flush non - circulating <br />driveways. All meters must be located on a public right of way or easement given <br />o <br />in this section of <br />by the owner (and legally recorded) of the property. Meters and other utility <br />Z <br />water pipe. <br />obstructions must be relocated by and at the expense of the owner or contractor. <br />* <br />- All installed pipe will have letters /numbers at the 12:00 positions when installed. <br />Z <br />Driveway access grade at sidewalk cannot exceed 2% cross slope. Curb cut to <br />0 <br />- All fittings shall have mechanical joint restraining glands unless other restraining <br />front of sidewalk cannot exceed 10% normal. <br />measures are called for or agreed upon. All valves will have 3000psi concrete <br />Engineering will inspect all new subdivision work inclusive of the street, curb, curb <br />o <br />c <br />cradles /seats or approved pre -cast concrete blocks under them. <br />cut ramps to a public street, and driveway access installed during initial <br />construction. Building inspection will complete all sidewalk construction and <br />L <br />driveway access in development "build out" (less than three -plex) after release of <br />ID <br />WASTEWATER <br />subdivision by Engineering. <br />v <br />C <br />20. Required Equipment <br />All sidewalks and driveways shall meet applicable ADA and TAS standards. <br />Y <br />Public Sewer Lines <br />STREET CONSTRUCTION <br />- ZE OF <br />iP••• •• F.t,� <br />o <br />3 <br />i S,.•. i <br />� <br />Up to and Larger than 6 9/32 = SDR 26 in the city right of way <br />25. Inspection - All new street construction in public right of way and easements will be <br />AF *��• <br />v <br />Private Sewer Lines <br />inspected by the Engineering Dept. <br />m <br />Less than or equal 4 9/32 Schedule 40 <br />26. Notes <br />•••••• " "••••• . ............ ; *� <br />.0 <br />Larger than or equal 6 9/32 = Schedule 40 <br />Subgrade shall be scarified to 6 inches below finished subgrade elevation and <br />it....Q_yN_. FRIEDJYIgN <br />U o <br />Approved connections <br />compacted to required density. <br />�'O. 88486 •• <br />following measures <br />•Q <br />w <br />Furnco <br />For subgrode soils with a plasticity index of 25 and above, the <br />be odopted: <br />O. <br />et <br />P <br />PVC <br />,should <br />laboratory. <br />ts "•• <br />3 <br />1) A recommendation from an approved testing <br />2) Subgrade must be replaced with 18 inches of approved material with a P.I. <br />/O r <br />+ <br />0 <br />L <br />21. Inspection <br />than 4. <br />less than 15 and more <br />3) Lime stabilize a minimum of B inches of subgrode. <br />(o to <br />Public <br />4) Increase the thickness of the designed flexible limestone base by 50%. <br />dill <br />ZIP <br />o <br />The Department of Engineering is responsible for inspection to <br />Subgrade must be at a minimum density of 95% of optimum and have a moisture <br />ithe <br />Y <br />private property line /ROW line and easement line. <br />content that is within 3 percentage points above or below optimum. <br />o <br />Tests Required: <br />After the subgrode has been shaped and graded to final grade then it shall be <br />4 -psi low air pressure test <br />proof rolled to locate unstable areas. <br />TV camera all public lines <br />Flexible base material shall be placed in a minimum of 2 lifts not to exceed 6 <br />klotz�i)associates <br />m <br />Mandrill test required 30 days after backfill of pipe trench <br />inches in each compacted lift. <br />0 <br />a <br />i <br />Manholes require vacuum test 3 min @ IOHg <br />Flexible base must be at a minimum density of 100% and have a moisture content <br />a <br />o <br />Forced main requires 1 hour @50 psi <br />that is within 3 percentage points of optimum. <br />CITY OF SAN MARCO S <br />o <br />Note: The contractor can wait to do the air pressure test when the <br />The final lift of base shall be smooth and in conformity with lines and grades <br />mandrill test is done or a preliminary mandrill test con be done after <br />shown on the plans. Prior to placing asphalt on the completed base, the base <br />a� <br />a <br />backfill and before the air pressure test to help contractors schedule <br />shall be cured to the extent directed by the engineer or his field representative. <br />SAN MARCOS SIDEWALK PROJECT <br />o M <br />repairs if there is a failure in the mandrill test. <br />Valve risers and manhole castings shall be raised to finished e l evat i ons. Bockf i l l <br />GUADALUPE STREET - SIDEWALK <br />o .- <br />Private <br />in streets for manholes shall be cement stabilized sand (2 sacks per cubic yard) <br />L N <br />and shall be a minimum of 12 inches thick. <br />E ° <br />o <br />The Building Department is responsible for inspection on private property <br />Cutback Coat) be applied to the completed base <br />GENERAL NOTES <br />C ^ Low <br />- pressure air test with 5 PSI on all lines or 105 /y hydrostatic <br />Asphaltic material (Prime shall <br />course and allowed to set 24 hours before paving the roadway. An Emulsified <br />u, <br />22. Notes General <br />Asphalt Tack Coat con be used in lieu of the prime coat and /or placed on the <br />N <br />0 OD <br />All sewer lines to be installed 9' minimum from any water line in o public way and <br />prime coat. <br />0 <br />5—minimum from any water line on private property. Contact Engineering or <br />Asphalt must be at a temperature of between 120 C and 175 C when discharged <br />3 OF 4 <br />Building Department for alternate standards. <br />from the mixer and compacted using steel -wheel rollers, vibratory rollers and <br />o N <br />Any service tap serving more than one lot must have clean -outs located no less <br />pneumatic -tire rollers. <br />HEET <br />KEOTZ ASSOCIATES INC. PROJECT NO. NO• <br />than six foot apart at the property line. <br />The contractor or his testing technician shall check the density of the compacted <br />0564.002.000 I /�/� <br />6 <br />All holes to be cored (not chiseled). All manholes, on public and private land, <br />asphalt at regular intervals. Samples of the 'asphalt should be taken as the <br />STATE COUNTY ` c <br />man <br />to be tested at tOmo vacuum prior to lining the manhole. All wastewater manholes <br />asphalt leaves the hamper of the compaction and cores <br />paving machine before cam <br />TEXAS HAYS <br />W w <br />installed on and private land, are to be lined (coated) <br />shall be taken of these Sampling locations. A minimum of 3 samples should be <br />CITY OF SAN NARCOS REFERENCE NUMBER HIGHWAY N0. <br />J H <br />public <br />token daily. I y. <br />C) <br />RFP 26 -001 LOOP B2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.