Laserfiche WebLink
then, under certain conditions, required thickness of <br />beams may be altered by written consent of the building <br />official. All other foundations for buildings here- <br />after constructed within the limits of the City of <br />San Marcos shall conform to applicable sections of this <br />code. When steel is in place, there shall be an in- <br />spection made by the City of San Marcos building in- <br />spector and a tag affixed stating that the above re- <br />quirements have been complied with and showing the date <br />of inspection. <br />Sec. 5-26. Section 106.2A <br />Section 106.2A of said Code is amended so that it will <br />now read as follows: <br />It shall be the duty of every contractor or builder <br />to pay annual license fee of seventy-five <br />and no/100 dollars ($:75.00) and to register his name <br />in a book provided for that purpose with the building <br />official, giving full name, residence and place of <br />business, and, in case of removal from one place to <br />another to have made corresponding change in said <br />register accordingly; and it shall be the further duty <br />of every such person to give good and sufficient bond <br />in the sum of five thousand and no/100 dollars ($5,000.00), <br />to be approved by the building official, conditioned to <br />conform to the building regulations, the regulations of <br />this section, and other ordinances of the City Council <br />in reference to the buildings. All bonds and licenses <br />shall expire the 31st day of December of the year issued. <br />Sec. 5-27. Section 106.2B <br />Section 10.2B of said Code is amended so that it will <br />now read as follows: <br />No license or bond shall <br />of a structure owned and <br />as his or her residence. <br />shall be required and all <br />Sec. 5-28. Section 107.4 <br />be required of the builder <br />to be occupied by the builder <br />However, a building permit <br />applicable codes adhered to. <br />Section 107.4 of said Code is amended so that it will <br />now read in full as follows: <br />On all buildings, structures or <br />a building permit, as set forth <br />shall be paid as required at the <br />in accordance with the following <br />a. Permit Fees <br />$200.00 and less <br />$201100 to $1,000.00 <br />$1,001.00 to $2,000.00 <br />$2,001.00 to $15,000.00 <br />alterations requiring <br />in Section 105, a fee <br />time of filing application, <br />schedule: <br />No fee, unless in- <br />spection required. <br />$5.00 fee for each <br />spection shall be <br />$10.00 flat fee. <br />$15.00 flat fee. <br /> <br />r <br />i n". <br />charged. <br />$25.00 for the first <br />$2,000.00 plus $3.00 for <br />each additional thousand <br />or fraction thereof to <br />and including $15,000.00