Laserfiche WebLink
measures shall comply with the Soil Conservation Service manual <br />titled "Erosion and Sediment Control Guidelines for Developing <br />Areas in Texas". The final Judgement on the erosion controls and <br />construction sequencing shall be made by the Planning and Zoning <br />Commission within thirty (30) days of the filing of the plan. The <br />provisions of section 206.1 shall apply. <br />C. Within two (2) days of writen notice to the person holding the ap- <br />proved Site Development Permit, modifications from the approved <br />erosion control and construction sequencing plans may be made in <br />the field if the Director of Publ b Works deems the controls or <br />sequencing inappropriate or inadequate and has confirmed his/her <br />findings with the Planning and Zoning Commission and has their <br />written approval. <br />1 <br />M