My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 1:50:47 PM
Creation date
12/1/2015 2:58:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-150
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br />SCOPE OF SERVICES <br />4 . CITY OF SAN MARCOS <br />MCKIE AND LEE STREET WATER REPLACEMENT <br />10 SEPTEMBER 2015 <br />PROJECT UNDERSTANDING <br />The work to be performed by Weston Solutions, Inc. ( WESTON) under this contract shall consist of <br />providing Preliminary Engineering Phase (30940), Design Engineering Phase (60 %, 90 %, and 100 %), Bid <br />Phase and Construction Phase Services for the McKie and Lee Street Water Replacement Project. The <br />McKie and Lee Street Water Replacement Project will provide for the installation of approximately 1,650 <br />LF of 12 -inch water main along McKie St.; 820 LF of 8 -inch water main along Lee St.; and 205 LF of 2- <br />inch water line for customers at McKie St at Love St. <br />BASIC SCOPE OF SERVICES <br />Task 1000 Preliminary Phase (30 %) <br />1. Project Management and QA/QC: This task includes routine communication with the City; <br />managing subconsultants, staff' resources, budgets, and schedules; preparation of field health and <br />safety plans (HASP) for field investigations and site visits; invoicing; implementing and <br />monitoring of QA /QC efforts; and other activities associated with managing the project. <br />2. Meetings <br />a. Project Meetings: WESTON will prepare for and attend one (1) meeting with the City to <br />review the 30 % Technical Memo submittal, including review of the proposed design and <br />required project permitting. <br />b. Public Meetings: A public meeting is not anticipated for the 30% Preliminary <br />Engineering Phase. <br />c. Utility Coordination Meeting: Participation in a utility coordination meeting is not <br />included in this scope of services. <br />3. Data Collection/Review <br />a. Review Reports /Studies/Drawings: WESTON will obtain and review reports, studies, as- <br />builts, and other data related to the project. A base map of the project area will be <br />developed using available information. The base map will include aerial photography, <br />topography, parcels, right -of -way, existing water and wastewater lines from the City's <br />GIS system, FEMA floodplain, and other appropriate data. The base map will be utilized <br />by the project team during the Preliminary Phase of the project. <br />b. Site Visits: Site visits will be performed to verify project conditions and familiarize the <br />team with the project area. <br />c. Staff Meetings: Internal WESTON staff team meetings will be conducted to review <br />available data and review design development. <br />4. Field Investigations <br />a. Topographic Surveying: Byrn & Associates, Inc. will provide topographic surveying <br />services for the project. The surveying services shall include: <br />■ Provide horizontal and vertical control for topographic survey. <br />Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.