Laserfiche WebLink
ATTACHMENT A <br />W_WA�= SCOPE OF SERVICES <br />CITY OF SAN MARCOS <br />MCKIE AND LEE STREET WATER REPLACEMENT <br />10 SEPTEMBER 2015 <br />• Topographic survey of entire right of way of McKie Street, from the its intersection <br />with Cheatham Street to Willow Springs Creek. Lee Street, from McKie Street to <br />Guadalupe Street. Love Street, from McKie Street westerly 250 feet. <br />• Locate all above ground planimetric features, including existing structures, edge of <br />roads, evidence of underground utilities, overhead utilities, fences, trees 6 -inch <br />diameter and larger, ditch flowlines and other pertinent features affecting design. <br />• Water valve top of nut elevations. <br />• Locate existing property lines and property comers. <br />• Contact Digg -Tess for location of existing utilities <br />• The topographic information will be provided in Autocad format with the <br />triangulation network for the existing surface. <br />b. Subsurface Utility Locates: Subsurface utility locates will be provided as a Supplemental <br />Service, as required. Refer to Task 6000 for subsurface utility locates scope of services. <br />c. Geotechnical Investigation: Holt Engineering, Inc. will provide geotechnical <br />investigation services for the project under Supplemental Services for this project. Refer <br />to Task 6000 for the geotechnical scope of services. <br />d. Geotechnical Assessment: A Geological Assessment is not included in this scope of <br />work. <br />e. Environmental and Permitting Review: WESTON will perform desktop review of <br />environmental and natural resources mapping and databases to identify any project <br />constraints to the proposed project. Potential sources of information include published <br />reports, aerial photographs, maps, and records at the Texas Natural Resources <br />Information Systems archives. The results of the desktop review search and permitting <br />identification will be summarized in the Preliminary Engineering Technical <br />Memorandum. <br />f. Archeological: WESTON will prepare and submit a coordination letter to the Texas <br />Historical Commission (THC) to determine if any archeological surveys are required for <br />the project area. This scope of services does not include preparation of any archeological <br />permits and/or archeological field surveys. <br />5. Pipelines <br />a. Determine Alignments: Using the survey and other field investigation data, WESTON <br />will determine the most suitable line assignment for the new water pipelines, with <br />consideration to water /sanitary sewer minimum separation distances, <br />constructability /traffic, connections /tie -in to existing water distribution system, and other <br />utilities. <br />b. Preliminary Hydraulics/Modeling: Water line hydraulics /modeling is not required of <br />WESTON; proposed water line sizing was previously determined by City of San Marcos <br />staff. <br />c. Drainage: WESTON will identify areas where existing curbs will require replacement as <br />a result of the proposed water replacement project. <br />Page 2 of 7 <br />