My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 1:50:47 PM
Creation date
12/1/2015 2:58:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-150
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. 90% Plans — four (4) 11 "x 17" hard copy sets and 1 PDF. Plans will include: Cover <br />Sheet, Project Layout Sheet, Plan and Profile Sheets, Quantities By Sheet, Traffic Control <br />Sheets, Tree Protection and Erosion Sedimentation Control Sheets, Standard Details, and <br />Special Details. <br />b. 90 % Specifications including Project Specific /Special Specifications. <br />c. 90% Opinion of Probable Construction Cost (OPCC). An updated OPCC will be <br />provided. <br />d. 90 % Construction Schedule. An updated construction schedule will be provided. <br />e. 90% Bid Form. A draft bid form will be provided. <br />8. 99% Submittal: A 99 % design set of plans will be prepared and submitted. COSM staff will <br />review plans to confirm that all review comments and necessary revisions have been addressed. <br />Four (4) sets of 11 "x 17" plans and a PDF copy will be provided for review. <br />9. 100% Final Submittal: WESTON will provide final sealed plans including: two (2) 11 "x17" Sets; <br />electronic copies in PDF and CAD; Construction Checklist; Bid Form in MSWord; and <br />Specifications in PDF. <br />Task 3000 Bid Phase <br />1. Project Management: This task includes routine communication with the City; managing <br />manpower, budgets, and schedules; invoicing; and other activities associated with managing the <br />project. <br />2. Attend Pre -Bid Meeting: WESTON will assist the City in conducting pre -bid meeting and <br />developing the agenda. <br />3. Answer Questions: WESTON will coordinate with the City for issuing responses for technical <br />questions and requests for additional information. <br />4. Issue Addenda: WESTON will prepare any Addenda that are required to address changes to bid <br />documents during the bid phase. <br />5. Bid Tabulation and Recommendation of Award: WESTON will review bids and evaluate bids <br />for responsiveness and bid amount. WESTON will also check references, by email or telephone, <br />of the apparent low bidder and second low bidder. WESTON will prepare a letter summarizing <br />the review and evaluation and include recommendations for award of the contract for <br />construction, or other action as may be appropriate. The City shall make the final decision on the <br />award of the contract for construction and the acceptance or rejection of all bids. <br />6. Conformed Documents Deliverables: WESTON will incorporate addenda items in the <br />Construction Plans; include addenda in the bound Project Manual; and issue a "Conformed" set <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.