My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 1:50:47 PM
Creation date
12/1/2015 2:58:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-150
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT B2 <br />GEOTECIINICAL ENGINEERING <br />i <br />DRILLING & SAMPLING ENGINEERING, INC <br />FOUNDATION DESIGN _ _ <br />11 August 2015 <br />Revised: 8 September 2015 <br />Weston Solutions <br />70 N. E. Loop 410, Ste. 600 <br />San Antonio, Texas 78216 <br />Attn: Mr. Abdel Hamed, P. E. <br />Re: Mckie Street Waterline Replacement <br />San Marcos, Texas <br />Dear Mr. l4amed: <br />CONSTRUCTION INSPECTION <br />LABORATORY TESTING <br />MATERIALS TESTING <br />As per your request, we are providing a cost estimate for performing a Geotechnical Investigation at the above <br />referenced project site. The purpose of the investigation is to determine subsurface soil and groundwater <br />conditions at the site and obtain samples for laboratory testing in order to provide data to the engineer for <br />underground utility construction. <br />It is our understanding the project consists of replacing an existing 2 -inch water line with a new 12 -inch <br />diameter water line. The water line is approximately 2,675 L.F. and will be installed through typical open <br />cutting and filling. <br />SCOPE OF SERVICES <br />The scope of our services will include: <br />1. Laying out soil borings in the field and coordinating utilities (electrical, water, wastewater, sewer, <br />telephone, and gas) with line locators. Obtaining permits from the City of San Marcos for the <br />drilling in existing streets. <br />2. Provide all necessary manpower, equipment and materials for drilling, logging and sampling four <br />soil borings to depths of approximately 15 feet each. All bore holes will be sampled using either <br />Shelby tubes or split -spoon samplers as appropriate. Water level measurements will be made in the <br />open borehole during drilling and just prior to plugging. <br />3. Field logging to include visual classifications and pocket penetrometer testing. <br />4. Plugging all bore holes upon completion of the drilling operations. <br />5. Provide traffic control during drilling. <br />2220 BaHoo Skyway - Austin, Texas • 78704 • Pk. (512) 3374166 • Fax (512) 337 -0B32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.