Laserfiche WebLink
Mr. Hamed <br />Mckie Street Water Line <br />Revised 8 September 2015 <br />Page 2 of 4 <br />6. Laboratory testing of selected samples for Atterberg limits, moisture contents, unconfined <br />compression tests, minus 200 mesh sieves and unit weights. <br />7. Geotechnical Data Report (GDR) which will include a generalized boring location plan, logs of <br />borings with geologic formations, description of drilling operations, laboratory test results, water <br />level readings and soil classifications. <br />8. Geotechnical Design Memorandum (GDM) which will include construction considerations and <br />recommendations for pavement replacement, backfiIl compaction, pipe bedding, bearing capacities <br />and other geotechnical parameters as requested by the civil engineer. <br />9. A site reconnaissance of the project by the geotechnical project engineer to observe pavement <br />conditions and other physical features that may affect utility construction. <br />We guarantee the cost for the above work will not exceed $7,290.00 without your prior approval. An itemized <br />cost estimate is attached. We appreciate the opportunity to offer our services. If we can answer any questions <br />concerning the above, please do not hesitate to call. <br />Sincerely, <br />Steve B. Johnson, E. <br />Geotechnical Division Manager <br />Holt Engineering, Inc. <br />TBPE Firm Registration No. F-430 <br />