My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 1:50:47 PM
Creation date
12/1/2015 2:58:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-150
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Hamed <br />Mckie Street Water Line <br />Revised 8 September 2015 <br />Page 2 of 4 <br />6. Laboratory testing of selected samples for Atterberg limits, moisture contents, unconfined <br />compression tests, minus 200 mesh sieves and unit weights. <br />7. Geotechnical Data Report (GDR) which will include a generalized boring location plan, logs of <br />borings with geologic formations, description of drilling operations, laboratory test results, water <br />level readings and soil classifications. <br />8. Geotechnical Design Memorandum (GDM) which will include construction considerations and <br />recommendations for pavement replacement, backfiIl compaction, pipe bedding, bearing capacities <br />and other geotechnical parameters as requested by the civil engineer. <br />9. A site reconnaissance of the project by the geotechnical project engineer to observe pavement <br />conditions and other physical features that may affect utility construction. <br />We guarantee the cost for the above work will not exceed $7,290.00 without your prior approval. An itemized <br />cost estimate is attached. We appreciate the opportunity to offer our services. If we can answer any questions <br />concerning the above, please do not hesitate to call. <br />Sincerely, <br />Steve B. Johnson, E. <br />Geotechnical Division Manager <br />Holt Engineering, Inc. <br />TBPE Firm Registration No. F-430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.