My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 1:50:47 PM
Creation date
12/1/2015 2:58:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-150
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GEOTECHNICAL INVESTIGATION <br />FOR <br />MCKIE STREET WATERLINE REPLACEMENT <br />SAN MARCOS, TEXAS <br />COST ESTIMATE⢠<br />1. Rig Mobilization: .............................................................................................. $ 450.00 <br />2. Engineering Site Reconnaissance and Management Time: <br />3 Hrs. @ $ 150. 00/ Hr .......................................................... ............................... 450.00 <br />3. Street Cut Permit: 1 Street @ $ 150. 00/ Ea ........................ ............................... 150.00 <br />4. Drilling Coordinator Time to Layout Hole and Obtain Permit: <br />3 Hrs. @ $ 100. 00/ Hr .......................................................... ............................... 300.00 <br />5. Traffic Control Signs and Cones: l Day @ $850.00/ Day .. ............................... 850.00 <br />5. Drilling, Logging & Sampling: <br />4 Borings @ 15 Ft/Ea.: 60 L. F. @ $ 16. 00/ Ft .................... ............................... 960.00 <br />Split- Spoon/Shelby Tube Samples: 16 Samples @ $ 20 .00/Ea ........................ 320.00 <br />Plug Holes & Disposal of Cuttings: 4 Borings @ $ 45. 00 /Ea ........................... 180.00 <br />6. Laboratory Testing: <br />8 Moisture Contents @ $ 15. 00/ Ea ..................................... ............................... 120.00 <br />8 Atterberg Limits @ $ 75. 00/ Ea ........................................ ............................... 600.00 <br />4 Unconfined Compression Tests @ $45.00/Ea ............... ............................... 180.00 <br />8 Minus 200 Sieves @ $ 35. 00/ Ea ...................................... ............................... 280.00 <br />LaboratorySubtotal ................................................. ..............................$ 1,180.00 <br />7. Geotechnical Data Report w /Generalized <br />Boring Location Plan, Logs of Borings, Field and Laboratory <br />Test Results, and Description of Geology: ....................................................... 1,500.00 <br />8. Geotechnical Design Memorandum with Construction Considerations, <br />Recommendations for Backfill Placement and Compaction, Allowable <br />Bearing Values, Lateral Earth Pressures and other Geotechnical Parameters <br />per the Civil Engineer's Request: .................................................................... 950.00 <br />TOTAL ESTIMATED COST .. N .......... .................N......NHN...$ 7,290.00 <br />H 0 r 2220 Banon Skyway - Austin. Texas -79704- P6. (512) 447 -8166- rax (512) 447.6852 <br />nwcuyuacvc.nwc <br />
The URL can be used to link to this page
Your browser does not support the video tag.