Laserfiche WebLink
GEOTECHNICAL INVESTIGATION <br />FOR <br />MCKIE STREET WATERLINE REPLACEMENT <br />SAN MARCOS, TEXAS <br />COST ESTIMATE: <br />1. Rig Mobilization: .............................................................................................. S 450.00 <br />2. Engineering Site Reconnaissance and Management Time: <br />3 Hrs. @ $ 150. 00/ Hr .......................................................... ............................... 450.00 <br />3. Street Cut Permit: 1 Street @ $150.00/Ea ........................ ............................... 150.00 <br />4. Drilling Coordinator Time to Layout Hole and Obtain Permit: <br />3 Hrs. @ $ 100. 00/ Hr .......................................................... ............................... 300.00 <br />5. Traffic Control Signs and Cones: l Day @ $850.00/ Day .. ............................... 850.00 <br />5. Drilling, Logging & Sampling: <br />4 Borings @ 15 Ft/Ea.: 60 L. F. @ $ 16. 00/ Ft .................... ............................... 960.00 <br />Split- Spoon/Shelby Tube Samples: 16 Samples @ $ 20 .00/Ea ........................ 320.00 <br />Plug Holes & Disposal of Cuttings: 4 Borings @ $ 45. 00 /Ea ........................... 180.00 <br />6. Laboratory Testing: <br />8 Moisture Contents @ $ 15. 00/ Ea ..................................... ............................... 120.00 <br />8 Atterberg Limits @ $ 75. 00/ Ea ........................................ ............................... 600.00 <br />4 Unconfined Compression Tests @ $ 45. 00/ Ea ................ ............................... 180.00 <br />8 Minus 200 Sieves @ $ 35. 00/E a ...................................... ............................... 280.00 <br />Laboratory Subtotal ................................................. ..............................$ 1,180.00 <br />7. Geotechnical Data Report w /Generalized <br />Boring Location Plan, Logs of Borings, Field and Laboratory <br />Test Results, and Description of Geology: ....................................................... 1,500.00 <br />8. Geotechnical Design Memorandum with Construction Considerations, <br />Recommendations for Backfill Placement and Compaction, Allowable <br />Bearing Values, Lateral Earth Pressures and other Geotechnical Parameters <br />per the Civil Engineer's Request: ...................................................................... 950.00 <br />TOTAL ESTIMATED COST ................. ...................... ».......$ 7,290.00 <br />HO L �' 2220 Banat Skyway , Austin. Texas - 78704 - Pk (512) 447.8166- Fax (5 12) 447-0852 <br />urcwx"Umlem <br />