Laserfiche WebLink
M ATTACHMENT C <br />SCHEDULE <br />W = I Tk- - A mm�] CITY OF SAN MARCOS <br />MCKIE AND LEE STREET WATER REPLACEMENT <br />10 SEPTEMBER 2015 <br />The anticipated project schedule is as follows: <br />Design: December 2015 until Summer 2016 <br />Construction: December 2016 until March 2017 <br />Closeout Phase: April 2017 until August 2017 <br />Page 1 of 1 <br />