My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-160/approving a professional engineering services agreement between the City and Unintech Consulting Engineers, inc. for the provision of professional services in connection with the Mill Street Improvements project in the not-to-exceed amount o
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-160/approving a professional engineering services agreement between the City and Unintech Consulting Engineers, inc. for the provision of professional services in connection with the Mill Street Improvements project in the not-to-exceed amount o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 2:12:22 PM
Creation date
12/1/2015 3:08:00 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-160
Date
11/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />Contract Number: 216 -043 <br />This Agreement is effective November 17, 2015 between the City of San Marcos, Texas, <br />a home -rule municipal corporation, (the "City "), 630 East Hopkins, San Marcos, Texas 78666 and <br />Unintech Consulting Engineers, Inc. (the "Engineer "), 3737 Executive Center Dr. #101 Austin, <br />Texas 78731 for the Engineer's provision of engineering services in connection with the Mill <br />Street Improvements Project (the "Project "). <br />The City and the Engineer agree as follows: <br />ARTICLE 1 <br />ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br />A. The term of this Agreement begins on the effective date established above and will end <br />upon the Engineer's completion, and the City's acceptance of all services included in this <br />Agreement. The Engineer agrees to provide the City with the services described in Attachment A, <br />Scope of Services, which is incorporated herein by reference for all intents and purposes. The <br />services for this Project are more generally described as the provision of engineering and technical <br />services necessary for the preparation of plans, specifications and estimates for the construction of <br />roadway improvements along Mill Street in San Marcos from 100 feet southwest of the <br />intersection of Mill Street and Uhland Road, northeast approximately 1,500 linear feet in order to <br />tie to the new section previously constructed, and 100 feet along each leg of Uhland Road at the <br />Intersection. <br />B. The Engineer understands that time is of the essence and agrees to provide all design work <br />and professional services in the most expedient and efficient manner possible in order to complete <br />the Project by May 10, 2016 in accordance with the approved Project schedule included in this <br />Agreement as Attachment B. <br />C. The Engineer's Basic Services will be performed by the Engineer as well as through the <br />following consulting disciplines as subconsultants to the Engineer: <br />(1) Environmental Services: Horizon <br />(2) Geotechnical Services: HVJ Associates <br />(3) Traffic Signal Services: Klotz <br />The Engineer will not subcontract any work under this Agreement, outside of that specified above, <br />without prior written approval from the City. In the event approval is given by the City, the <br />Engineer will specify the appropriate insurance requirements and miscellaneous provisions by <br />separate written agreement with the subcontractor. <br />Unintech Consulting Engineers, Inc. — Mill Street Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.