My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-174/approving a professional engineering services agreement between the City and Freese and Nichols, Inc. for the provision of professional services in connection with the Main Lift Station Force Main Replacement and Reclaimed Water Improvements
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-174/approving a professional engineering services agreement between the City and Freese and Nichols, Inc. for the provision of professional services in connection with the Main Lift Station Force Main Replacement and Reclaimed Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 8:51:15 AM
Creation date
12/22/2015 10:14:30 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-174
Date
12/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c) Plan Sheets (see items under Il.b. Design Phase in City of San Marcos "Engineering <br />Scope of Services Checklist ") <br />d) Profile (For piping 16 -inch diameter and greater) <br />e) Details <br />f) Quantities — broken down by page <br />g) Standard Details —COSM and COA <br />2) Specifications <br />a) Index of Specs <br />b) Modifications to Standard Specifications <br />c) COSM Adopted Specs — Project Specific <br />d) Special Specifications (including easements) <br />3) Bid Form <br />4) Construction Schedule <br />5) Opinion of Probable Construction Cost— broken down by sheet <br />6) FORCE MAIN, RECLAIMED WATER LINE AND BULK REFILLING STATION - 99% DESIGN SUBMITTAL <br />FNI will incorporate any comments made by the City in the 75% design submittal and submit a 99% <br />complete submittal for review. <br />5. Phase Deliverables <br />a. 99% Submittal (4 —11" x 17" Sets, 1 pdf) <br />1) Plan Set (include items from 30% and 75% submittal) <br />(a) Unsealed plans with all comments addressed <br />6. Coordination with the TCEQ: <br />If requested by the TCEQ, FNI will submit plans and specifications for their review. <br />E. FORCE MAIN, RECLAIMED WATER LINE AND BULK REFILLING STATION -100% DESIGN SUBMITTAL <br />FNI will incorporate any comments made by the City in the 99% design submittal and resubmit a 100% <br />complete submittal for review. <br />1. Phase Deliverables <br />a. 100% Submittal Sealed (2 —11' x 17" Sets, 1 pdf, 1 CAD) <br />1) Sealed Plan Set (include all items from 30% & 90% submittal) <br />2) Construction Check List (1 pdf) <br />3) Bid form (Word version) <br />4) Technical Specifications (1 pdf) <br />2. Coordination with the TCEQ: <br />If requested by the TCEQ FNI will submit plans and specifications for their review. <br />Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.