Laserfiche WebLink
c) Plan Sheets (see items under Il.b. Design Phase in City of San Marcos "Engineering <br />Scope of Services Checklist ") <br />d) Profile (For piping 16 -inch diameter and greater) <br />e) Details <br />f) Quantities — broken down by page <br />g) Standard Details —COSM and COA <br />2) Specifications <br />a) Index of Specs <br />b) Modifications to Standard Specifications <br />c) COSM Adopted Specs — Project Specific <br />d) Special Specifications (including easements) <br />3) Bid Form <br />4) Construction Schedule <br />5) Opinion of Probable Construction Cost— broken down by sheet <br />6) FORCE MAIN, RECLAIMED WATER LINE AND BULK REFILLING STATION - 99% DESIGN SUBMITTAL <br />FNI will incorporate any comments made by the City in the 75% design submittal and submit a 99% <br />complete submittal for review. <br />5. Phase Deliverables <br />a. 99% Submittal (4 —11" x 17" Sets, 1 pdf) <br />1) Plan Set (include items from 30% and 75% submittal) <br />(a) Unsealed plans with all comments addressed <br />6. Coordination with the TCEQ: <br />If requested by the TCEQ, FNI will submit plans and specifications for their review. <br />E. FORCE MAIN, RECLAIMED WATER LINE AND BULK REFILLING STATION -100% DESIGN SUBMITTAL <br />FNI will incorporate any comments made by the City in the 99% design submittal and resubmit a 100% <br />complete submittal for review. <br />1. Phase Deliverables <br />a. 100% Submittal Sealed (2 —11' x 17" Sets, 1 pdf, 1 CAD) <br />1) Sealed Plan Set (include all items from 30% & 90% submittal) <br />2) Construction Check List (1 pdf) <br />3) Bid form (Word version) <br />4) Technical Specifications (1 pdf) <br />2. Coordination with the TCEQ: <br />If requested by the TCEQ FNI will submit plans and specifications for their review. <br />Page 6 of 13 <br />